Quick answers
What is this project?
Transfer of Environmental Clearance (EC) from M/s. Shyam Steel Industries to Maurvi Ispat for Proposed Expansion of Billets from 30,000 TPA to 1,89,000 TPA and Proposed Hot Charge Rolling Mill of 1,80,000 TPA is a proposed industrial project in Charoda, Raipur, Chhattisgarh. The site covers 12.7 acres.
Who is building it?
The applicant is Maurvi Ispat.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Charoda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹20.5 crore and a site of 12.7 acres.
When was it filed?
The application was filed on 18 Oct 2025.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 15 Oct 2026 |
| Application filed | 18 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Maurvi Ispat |
| Land area | 12.7 acres (5.2 ha) |
| Project cost | ₹20.5 crore |
| Village / locality | Charoda |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02646 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.7 acres, this one is smaller than 59% of them.
54 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Charoda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Billets from 30,000 TPA to 1,89,000 TPA and Proposed Hot Charge… — environmental approval granted, 0 m away
- Expansion of Billets from 30,000 TPA to 1,89,000 TPA and Proposed Hot Charge… — returned to applicant, 0 m away
- Expansion of Production Facilities of Induction Furnace With Ccm From Existing… — cleared for impact study, 250 m away
- Transfer of Environmental clearance (EC) from M/s SKS Ispat Limited to M/s SKS… — under environmental review, 1.3 km away
- Transfer for Environment Clearance due to change in ownership from Rashmi… — more information requested, 1.3 km away
- "Expansion of Integrated Steel Plant" by M/s SKS Ispat and Power Limited — lapsed, 1.4 km away
- Proposed Dyes and Dye Intermediate Manufacturing with production capacity of… — cleared for impact study, 1.6 km away
- Proposed Reconfiguration of DRI Kilns 4 x 50 TPD to 2 x 100 TPD of Sponge Iron… — lapsed, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.