What is Developing? Open the mapMap

LapsedIndustry · Bilaspur, Chhattisgarh

Proposed Expansion of Existing Sponge Iron Plant by Installation of 1 X 350 Tpd Dri Kilns

Proposed Expansion of Existing Sponge Iron Plant by Installation of 1 X 350 Tpd Dri Kilns is a lapsed industrial project in Sipahari, Bilha, Bilaspur, Chhattisgarh. The site covers 54.5 acres. Its stated project cost is ₹156 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Existing Sponge Iron Plant by Installation of 1 X 350 Tpd Dri Kilns

Project details

Official titleProposed Expansion of Existing Sponge Iron Plant by Installation of 1 X 350 Tpd Dri Kilns Along With Expansion of Cpp (Whrb) From 4 MW to 12 MW at Kh. No Part of 18/1 Situated at Village Silpahari at Sirgitti Industrial Area, Bilaspur (Chhattisgarh) by M/S Agrawal Structure Mills PVT LTD.
StatusLapsed
Status since29 Oct 2024
Application filed21 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAgrawal Structure Mills PVT Limited
Land area54.5 acres (22.1 ha)
Project cost₹156 crore
Village / localitySipahari
Taluk / tehsilBilha
DistrictBilaspur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01330

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 24 Aug 2024Environmental approval granted54.5 acres₹156 crore
Early planning filed 21 Jul 2024 (this page)Lapsed54.5 acres₹156 crore

In context

47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 54.5 acres, this one is smaller than 74% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sipahari, Bilha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Agrawal Structure Mills PVT Limited in Bilaspur

4 Agrawal Structure Mills projects in Bilaspur
All 6 Agrawal Structure Mills projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.