One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Existing Sponge Iron Plant by Installation of 1 X 350 Tpd Dri Kilns
Project details
| Official title | Proposed Expansion of Existing Sponge Iron Plant by Installation of 1 X 350 Tpd Dri Kilns Along With Expansion of Cpp (Whrb) From 4 MW to 12 MW at Kh. No Part of 18/1 Situated at Village Silpahari at Sirgitti Industrial Area, Bilaspur (Chhattisgarh) by M/S Agrawal Structure Mills PVT LTD. |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 21 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Agrawal Structure Mills PVT Limited |
| Land area | 54.5 acres (22.1 ha) |
| Project cost | ₹156 crore |
| Village / locality | Sipahari |
| Taluk / tehsil | Bilha |
| District | Bilaspur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01330 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 Aug 2024 | Environmental approval granted | 54.5 acres | ₹156 crore |
| Early planning filed 21 Jul 2024 (this page) | Lapsed | 54.5 acres | ₹156 crore |
In context
47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 54.5 acres, this one is smaller than 74% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sipahari, Bilha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing DRI-Based Integrated Steel Plant by Enhancement of… — more information requested, 0 m away
- Expansion of DRI - Based Steel Plant (2 × 100 TPD + 1 × 350 TPD to 2 × 100 TPD… — withdrawn, 0 m away
- Proposed Expansion of Existing Sponge Iron Plant by Installation of 1 X 350… — environmental approval granted, 0 m away
- Greenfield Wet Type Coal Washery Project Based on Heavy Media Cyclone… — cleared for impact study, 150 m away
- Expansion-cum-Amendment of existing project of M/s NACHIKETA POWER & STEEL… — cleared for impact study, 400 m away
- Amendment in Clearance Condition issued to M/s. Airan Steel and Power Pvt.Ltd — environmental approval granted, 800 m away
- Expansion of Steel Plant by Increasing the existing 100 TPD Sponge Iron… — environmental approval granted, 800 m away
- Industrial project by Arora (C.G.) Energy & Steel Pvt. Ltd. — environmental approval granted, 1000 m away
More from Agrawal Structure Mills PVT Limited in Bilaspur
- Expansion of Existing DRI-Based Integrated Steel Plant by Enhancement of… — more information requested
- Expansion of DRI - Based Steel Plant (2 × 100 TPD + 1 × 350 TPD to 2 × 100 TPD… — withdrawn
4 Agrawal Structure Mills projects in Bilaspur
All 6 Agrawal Structure Mills projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.