Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 1 Jul 2025 |
| Application filed | 24 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kunal S Saraf |
| Land area | 61.3 acres (24.8 ha) |
| Project cost | ₹1,259 crore |
| Village / locality | Hardi |
| Taluk / tehsil | Bilha |
| District | Bilaspur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02532 |
In context
47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 61.3 acres, this one is smaller than 53% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hardi, Bilha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Wet Type Coal Washery Project Based on Heavy Media Cyclone… — cleared for impact study, 300 m away
- Expansion of Existing DRI-Based Integrated Steel Plant by Enhancement of… — more information requested, 400 m away
- Expansion of DRI - Based Steel Plant (2 × 100 TPD + 1 × 350 TPD to 2 × 100 TPD… — withdrawn, 400 m away
- Proposed Expansion of Existing Sponge Iron Plant by Installation of 1 X 350… — lapsed, 400 m away
- Proposed Expansion of Existing Sponge Iron Plant by Installation of 1 X 350… — environmental approval granted, 450 m away
- Amendment in Clearance Condition issued to M/s. Airan Steel and Power Pvt.Ltd — environmental approval granted, 700 m away
- Expansion of Steel Plant by Increasing the existing 100 TPD Sponge Iron… — environmental approval granted, 700 m away
- Industrial project by Arora (C.G.) Energy & Steel Pvt. Ltd. — environmental approval granted, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.