Expansion of Existing DRI-Based Integrated Steel Plant by Enhancement of Sponge Iron Production Capacity from 1,65,000 TPA to 2,87,500 TPA, and MS Ingot/Billet Production Capacity from 30,000 TPA to 1,67,200 TPA

Expansion of Existing DRI-Based Integrated Steel Plant by Enhancement of Sponge Iron Production Capacity from 1,65,000 TPA to 2,87,500 TPA, and MS Ingot/Billet Production Capacity from 30,000 TPA to 1,67,200 TPA is a proposed industrial project in Sipahari, Bilha, Bilaspur, Chhattisgarh. The site covers 54.5 acres. Its stated project cost is ₹328.3 crore. As of 27 Nov 2026, its status is “More information requested” (since 20 Nov 2026).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion of Existing DRI-Based Integrated Steel Plant by Enhancement of Sponge Iron Production Capacity from 1,65,000 TPA to 2,87,500 TPA, and MS Ingot/Billet Production Capacity from 30,000 TPA to 1,67,200 TPA, along with Installation of Ferro Alloys Plant (2 × 9 MVA Submerged Arc Furnaces), Captive Coal Washery (0.25 MTPA Throughput Capacity), Captive Power Plant (29 MW), and Fly Ash Brick Manufacturing Unit (48,300 TPA) at Village Silpahari, Sirgitti Industrial Area, District Bilaspur, CG.
StatusMore information requested
Status since20 Nov 2026
Application filed16 Nov 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAgrawal Structure Mills PVT Limited
Land area54.5 acres (22.1 ha)
Project cost₹328.3 crore
Village / localitySipahari
Taluk / tehsilBilha
DistrictBilaspur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-04386

In context

47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 54.5 acres, this one is smaller than 74% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sipahari, Bilha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Agrawal Structure Mills PVT Limited in Bilaspur

4 Agrawal Structure Mills projects in Bilaspur