Quick answers
What is this project?
Greenfield Steel comprising of DRI Kilns (Sponge Iron – 2,31,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 2,37,600 TPA), Rolling mill (TMT bars / Structural Steel) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier / LDO as fuel)– 2,31,000 TPA), Gasifier for Reheating Furnace – (2000 NM3/Hr), Wire Drawing Mill (Wire) – ( 1,00,000 TPA), Ferro Alloy Unit 2 x 9 MVA & 1 x 6 MVA ( FeSi – 18,600 TPA / FeMn – 53,30 is a lapsed industrial project in Kathiya, Tilda, Raipur, Chhattisgarh. The site covers 77.2 acres.
Who is building it?
The applicant is Ksmr Industris Private Limited.
Has it been approved?
No. The application was lapsed on 4 Dec 2024, so it is no longer under consideration.
Where is it?
In Kathiya, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹400 crore and a site of 77.2 acres.
When was it filed?
The application was filed on 24 Feb 2024.
Project details
| Official title | Establishment of Greenfield Steel comprising of DRI Kilns (Sponge Iron – 2,31,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 2,37,600 TPA), Rolling mill (TMT bars / Structural Steel) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier / LDO as fuel)– 2,31,000 TPA), Gasifier for Reheating Furnace – (2000 NM3/Hr), Wire Drawing Mill (Wire) – ( 1,00,000 TPA), Ferro Alloy Unit 2 x 9 MVA & 1 x 6 MVA ( FeSi – 18,600 TPA / FeMn – 53,30 |
|---|---|
| Status | Lapsed |
| Status since | 4 Dec 2024 |
| Application filed | 24 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ksmr Industris Private Limited |
| Land area | 77.2 acres (31.3 ha) |
| Project cost | ₹400 crore |
| Village / locality | Kathiya |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01664 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 77.2 acres, this one is larger than 81% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kathiya, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Mangalam Cement Limited, Limestone Mine Project (Lease Code - PB20),… — under environmental review, 3 km away
- M/s Mangalam Cement Limited, Limestone Mine Project (Lease Code - PB20),… — cleared for impact study, 3 km away
- Nahardih Maghaipur Limestone Block (ML Area: 365.252 ha) with limestone… — cleared for impact study, 4.5 km away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — under environmental review, 6.2 km away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — under environmental review, 6.2 km away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — initial checks, 6.2 km away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — environmental approval granted, 6.2 km away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — under environmental review, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.