Quick answers
What is Proposed 120 KLPD Grain Based Distillery Plant (Ethanol)?
Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) is a proposed power project in Keotara, Tilda, Raipur, Chhattisgarh. The site covers 26.4 acres.
Who is building it?
The applicant is Ecofora Energy Biofuels Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Keotara, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 26.4 acres.
When was it filed?
The application was filed on 8 Jul 2026.
One of 5 filings for this project. The project's main page, with every filing and where each stands: Proposed 120 KLPD Grain Based Distillery Plant (Ethanol)
Project details
| Official title | Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) along with 4 MW Cogeneration Power Plant at Kasara No. 98/2,160/3,160/2,162,163,168,169,165/3,188,190/2,185,158/1,190/3, Keotara, Sub Dist: Tilda, Dist.: Raipur, Chhattisgarh by M/s Ecofora Energy Biofuels Private Limited ("EEBPL") |
|---|---|
| Status | Initial checks |
| Status since | 8 Jul 2026 |
| Application filed | 8 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Ecofora Energy Biofuels Private Limited |
| Land area | 26.4 acres (10.7 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Keotara |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03352 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 2 Nov 2026 | Under environmental review | 26.4 acres | ₹1.5 crore |
| Amendment filed 2 Nov 2026 | Under environmental review | 26.4 acres | ₹1.5 crore |
| Amendment filed 1 Oct 2026 | Under environmental review | 21.4 acres | ₹1.5 crore |
| New project filed 8 Jul 2026 (this page) | Initial checks | 26.4 acres | ₹1.5 crore |
| New project filed 29 Sept 2022 | Environmental approval granted | 26.4 acres | ₹1.5 crore |
In context
13 applications in Raipur since January 2022 are in the same category (Power): 4 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 26.4 acres, this one is smaller than 100% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Keotara, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — under environmental review, 0 m away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — under environmental review, 0 m away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — environmental approval granted, 0 m away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — under environmental review, 0 m away
- DRI Kilns (Sponge Iron 2,31,000 TPA), Induction Furnace with LRF & CCM (MS… — cleared for impact study, 2.4 km away
- DRI Kilns (Sponge Iron 1,32,000 TPA), Induction Furnace with LRF & CCM (MS… — environmental approval granted, 3.7 km away
- Proposed I/O Beneficiation Plant (1x 0.7 MTPA) 7,00,000 TPA, Pellet Plant… — environmental approval granted, 4.6 km away
- Proposed I/O Beneficiation Plant (1x 0.7 MTPA) 7,00,000 TPA, Pellet Plant… — cleared for impact study, 4.6 km away
All 5 Ecofora Energy Biofuels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.