What is Developing? Open the mapMap

Under environmental reviewIndustry · Raipur, Chhattisgarh

Proposed 120 KLPD Grain Based Distillery Plant (Ethanol)

Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) is a proposed industrial project in Keotara, Tilda, Raipur, Chhattisgarh. The site covers 21.4 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 7 Nov 2026).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Proposed 120 KLPD Grain Based Distillery Plant (Ethanol)?

Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) is a proposed industrial project in Keotara, Tilda, Raipur, Chhattisgarh. The site covers 21.4 acres.

Who is building it?

The applicant is Ecofora Energy Biofuels Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Keotara, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 21.4 acres.

When was it filed?

The application was filed on 1 Oct 2026.

One of 5 filings for this project. The project's main page, with every filing and where each stands: Proposed 120 KLPD Grain Based Distillery Plant (Ethanol)

Project details

Official titleProposed 120 KLPD Grain Based Distillery Plant (Ethanol) along with 4 MW Cogeneration Power Plant at Kasara No. 98/2,160/3,160/2,162,163,168,169,165/3,188,190/2,185,158/1,190/3, Keotara, Sub Dist: Tilda, Dist.: Raipur, Chhattisgarh by M/s Ecofora Energy Biofuels Private Limited ("EEBPL")
StatusUnder environmental review
Status since7 Nov 2026
Application filed1 Oct 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantEcofora Energy Biofuels Private Limited
Land area21.4 acres (8.7 ha)
Project cost₹1.5 crore
Village / localityKeotara
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03126

All filings for this project

This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 2 Nov 2026Under environmental review26.4 acres₹1.5 crore
Amendment filed 2 Nov 2026Under environmental review26.4 acres₹1.5 crore
Amendment filed 1 Oct 2026 (this page)Under environmental review21.4 acres₹1.5 crore
New project filed 8 Jul 2026Initial checks26.4 acres₹1.5 crore
New project filed 29 Sept 2022Environmental approval granted26.4 acres₹1.5 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 21.4 acres, this one is smaller than 53% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Keotara, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 5 Ecofora Energy Biofuels projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.