Quick answers
What is this project?
Gare Palma IV/2 & IV/3 Opencast and Underground Coal Mining Project of a Combined Production of 6.25 Mtpa in an Ml Area of 964.65 Ha and for Coal Washery of 4.75 Mtpa (800 Tph) is a withdrawn mining project in Sarasmai, Tamnar, Raigarh, Chhattisgarh. The site covers 2,383.7 acres.
Who is building it?
The applicant is Jindal Power Limited.
Has it been approved?
No. The application was withdrawn on 9 Dec 2024, so it is no longer under consideration.
Where is it?
In Sarasmai, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹750 crore and a site of 2,383.7 acres.
When was it filed?
The application was filed on 2 Dec 2024.
Project details
| Official title | Gare Palma IV/2 & IV/3 Opencast and Underground Coal Mining Project of a Combined Production of 6.25 Mtpa in an Ml Area of 964.65 Ha and for Coal Washery of 4.75 Mtpa (800 Tph) at Tamnar Tehsil, Raigarh District, Chhattisgarh |
|---|---|
| Status | Withdrawn |
| Status since | 9 Dec 2024 |
| Application filed | 2 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Jindal Power Limited |
| Land area | 2,383.7 acres (964.7 ha) |
| Project cost | ₹750 crore |
| Village / locality | Sarasmai |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01759 |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2,383.7 acres, this one is larger than 83% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4,767.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Sarasmai, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Change in Land Use Pattern of 48.208 Ha Already Diverted Forest Land for… — under forest review, 0 m away
- Change in Land Use Pattern of 48.208 Ha Already Diverted Forest Land for… — not approved, 0 m away
- Gare Palma IV/2 & IV/3 Opencast and Underground Coal mining project of a… — lapsed, 0 m away
- Gare Palma IV/2 & IV/3 Opencast and Underground Coal Mining Project of a… — withdrawn, 0 m away
- Gare Palma IV/2 & IV/3 Opencast and Underground Coal mining project of a… — environmental approval granted, 0 m away
- Gare Palma IV/2 & IV/3 Opencast and Underground Coal Mining Project of a… — environmental approval granted, 50 m away
- 4x150 MW coal based Thermal Power Plant located at Dongamahua, Tehsil-Tamnar,… — environmental approval granted, 2.1 km away
- Gare Palma IV/6 Coal Mine (4 Mtpa) and Coal Washery (4 Mtpa) in an Ml Area of… — under environmental review, 3.2 km away
More from Jindal Power Limited in Raigarh
- Banai & Bhalumunda Opencast Coal Mine project of M/s Jindal Power Limited… — under environmental review
- Banai & Bhalumuda Opencast Coal Mine project of M/s Jindal Power Limited… — under forest review
- Proposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power… — under environmental review
- Gare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00… — under environmental review
- Banai & Bhalumuda Opencast Coal Mine project of M/s Jindal Power Limited… — more information requested
- Change in Land Use Pattern of 48.208 Ha Already Diverted Forest Land for… — under forest review
23 Jindal Power projects in Raigarh
All 27 Jindal Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.