Quick answers
What is this project?
4x150 MW coal based Thermal Power Plant located at Dongamahua, Tehsil-Tamnar, District- Raigarh, Chhattisgarh is an approved power project in Dongamauha, Tamnar, Raigarh, Chhattisgarh. The site covers 96 acres.
Who is building it?
The applicant is Jindal Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Oct 2025), as of 27 Nov 2026.
Where is it?
In Dongamauha, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹3,831.8 crore and a site of 96 acres.
When was it filed?
The application was filed on 9 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Oct 2025 |
| Application filed | 9 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Jindal Steel Limited |
| Land area | 96 acres (38.9 ha) |
| Project cost | ₹3,831.8 crore |
| Village / locality | Dongamauha |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02720 |
In context
29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 96 acres, this one is smaller than 75% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dongamauha, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in "environmental Clearance Transfer Letter No.… — returned to applicant, 2 km away
- Expansion of Gare Palma IV/1 Coal Mine at Villages Nagaramuda, Tapranga,… — environmental approval granted, 2 km away
- Expansion of Gare Palma IV/1 Coal Mine at Villages Nagaramuda, Tapranga,… — environmental approval granted, 2 km away
- Expansion of Gare Palma IV/1 Coal Mine at Villages Nagaramuda, Tapranga,… — withdrawn, 2 km away
- Gare Palma IV/2 & IV/3 Opencast and Underground Coal Mining Project of a… — environmental approval granted, 2 km away
- Change in Land Use Pattern of 48.208 Ha Already Diverted Forest Land for… — under forest review, 2.1 km away
- Change in Land Use Pattern of 48.208 Ha Already Diverted Forest Land for… — not approved, 2.1 km away
- Gare Palma IV/2 & IV/3 Opencast and Underground Coal mining project of a… — lapsed, 2.1 km away
More from Jindal Steel Limited in Raigarh
- Gare Palma IV/6 Coal Mine (4 Mtpa) and Coal Washery (4 Mtpa) in an Ml Area of… — under environmental review
- Expansion of Existing Integrated Steel Plant From 3.6 Mtpa to 12.6 Mtpa Crude… — under environmental review
- Amendment in Ec for Change in the Project Land of Already Existing Integrated… — lapsed
- Transfer of Environmental Clearance granted for Integrated Steel plant (3.6… — environmental approval granted
- Transfer of Environmental Clearance granted for Cement Plant at Raigarh,… — environmental approval granted
- Application for "No Increase in Pollution Load" Certificate for Expansion of… — initial checks
8 Jindal Steel projects in Raigarh
All 39 Jindal Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.