Quick answers
What is this project?
Residential Township of Raipur Thermal Power Plant by Adani Power Limited is an approved residential project in Chicholi, Tilda, Raipur, Chhattisgarh. It plans 341 units in 15 towers of up to 10 floors on 22.9 acres.
Who is building it?
The applicant is Adani Power Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Jan 2025), as of 27 Nov 2026.
Where is it?
In Chicholi, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹163.9 crore and a site of 22.9 acres.
When was it filed?
The application was filed on 6 Dec 2024.
Project details
| Official title | Residential Township of Raipur Thermal Power Plant, at Village Raikheda, District Raipur, Chhattisgarh by Adani Power Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 20 Jan 2025 |
| Application filed | 6 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adani Power Limited |
| Use | Residential |
| Units | 341 |
| Towers | 15 |
| Floors (tallest) | 10 |
| Height | 35 m |
| Parking spaces | 363 |
| Land area | 22.9 acres (9.3 ha) |
| Built-up area | 62,367 m² (6,71,312 sq ft) |
| Plot area | 92,552 m² (9,96,220 sq ft) |
| Project cost | ₹163.9 crore |
| Village / locality | Chicholi |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02336 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Dec 2024 (this page) | Environmental approval granted | 22.9 acres | ₹163.9 crore |
| New project filed 12 Nov 2024 | Withdrawn | 22.9 acres | ₹163.9 crore |
In context
56 applications in Raipur since January 2022 are in the same category (Buildings & townships): 29 approved, 18 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 22.9 acres, this one is larger than 55% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chicholi, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Township of Raipur Thermal Power Plant by Adani Power Limited — withdrawn, 0 m away
- 2x685 MW Super Critical and 2x800 MW Ultra-Super Critical Thermal Power Plant… — environmental approval granted, 1 km away
- Proposed Expansion of Raipur Thermal Power Plant by adding 1600 (2x800) MW… — environmental approval granted, 1 km away
- Proposed Expansion of Raipur Thermal Power Plant by adding 1600 (2x800) MW… — cleared for impact study, 1 km away
- Project by Shri Baba Baidnath Ispat Private Limited — initial checks, 1.2 km away
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — under environmental review, 1.4 km away
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — more information requested, 1.4 km away
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — cleared for impact study, 1.4 km away
More from Adani Power Limited in Raipur
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — under environmental review
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — more information requested
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — cleared for impact study
- 2x685 MW Super Critical and 2x800 MW Ultra-Super Critical Thermal Power Plant… — environmental approval granted
- Water Intake Infrastructure Facilities by Adani Power Limited — forest land use approved
9 Adani Power projects in Raipur
All 68 Adani Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.