Quick answers
What is this project?
Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum) by Green Sustainable Manufacturing Pvt. Ltd is a rejected mining project in Laladhurwa, Sarangarh, Raigarh, Chhattisgarh. The site covers 496.4 acres.
Who is building it?
The applicant is Green Sustainable Manufacturing Private Limited.
Has it been approved?
No. The application was rejected on 9 Apr 2026.
Where is it?
In Laladhurwa, Sarangarh, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹268 crore and a site of 496.4 acres.
When was it filed?
The application was filed on 30 Nov 2025.
Project details
| Official title | Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum); along with installation of 700 TPH Crusher at Village- Laladhurwa,Jognipali,Kapisda,Sarsara & Dhaura Bhatha, Tehsil- Sarangarh, District- Sarangarh-Bilaigarh (Earlier Raigarh), State- Chhattisgarh, by Green Sustainable Manufacturing Pvt. Ltd |
|---|---|
| Status | Not approved |
| Status since | 9 Apr 2026 |
| Application filed | 30 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Green Sustainable Manufacturing Private Limited |
| Land area | 496.4 acres (200.9 ha) |
| Project cost | ₹268 crore |
| Village / locality | Laladhurwa |
| Taluk / tehsil | Sarangarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02403 |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 496.4 acres, this one is larger than 74% of them.
No other mining lease on record is within 500 m of this site; 44 have applied within 5 km.
Where it is
Laladhurwa, Sarangarh, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — under environmental review, 0 m away
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — under forest review, 0 m away
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — more information requested, 0 m away
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — cleared for impact study, 0 m away
- Mining project by M/s . S. N. Minerals, Proprietor Sima Kedia — lapsed, 1.5 km away
- Mining project by M/s . S. N. Minerals Proprietor Sima Kedia — cleared for impact study, 1.5 km away
- Mining project by M/s . S. N. Minerals — lapsed, 1.5 km away
- Mining project by M/s. Shri Shyam Minerals Prop. Deepak Singhal — environmental approval granted, 1.6 km away
More from Green Sustainable Manufacturing Private Limited in Raigarh
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — under environmental review
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — under forest review
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — more information requested
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — cleared for impact study
All 5 Green Sustainable Manufacturing projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.