Quick answers
What is this project?
Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum) by Green Sustainable Manufacturing Pvt. Ltd is a proposed mining project in Dhaurabhola, Sarangarh, Raigarh, Chhattisgarh. The site covers 496.4 acres.
Who is building it?
The applicant is Green Sustainable Manufacturing Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Dhaurabhola, Sarangarh, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹268 crore and a site of 496.4 acres.
When was it filed?
The application was filed on 25 Sept 2026.
One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone…
Project details
| Official title | Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum); along with installation of 700 TPH Crusher at Village- Laladhurwa,Jognipali,Kapisda,Sarsara & Dhaura Bhatha, Tehsil- Sarangarh, District- Sarangarh-Bilaigarh (Earlier Raigarh), State- Chhattisgarh, by Green Sustainable Manufacturing Pvt. Ltd |
|---|---|
| Status | Under environmental review |
| Status since | 8 Oct 2026 |
| Application filed | 25 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Green Sustainable Manufacturing Private Limited |
| Land area | 496.4 acres (200.9 ha) |
| Project cost | ₹268 crore |
| Village / locality | Dhaurabhola |
| Taluk / tehsil | Sarangarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03208 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Sept 2026 (this page) | Under environmental review | 496.4 acres | ₹268 crore |
| New project filed 10 Jul 2025 | Under forest review | 496.4 acres | ₹268 crore |
| New project filed 4 Jun 2025 | More information requested | 496.4 acres | ₹268 crore |
| Early planning filed 22 Apr 2024 | Cleared for impact study | 496.4 acres | ₹268 crore |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 496.4 acres, this one is larger than 74% of them.
No other mining lease on record is within 500 m of this site; 44 have applied within 5 km.
Where it is
Dhaurabhola, Sarangarh, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — not approved, 0 m away
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — under forest review, 0 m away
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — more information requested, 0 m away
- Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with… — cleared for impact study, 0 m away
- Mining project by M/s . S. N. Minerals, Proprietor Sima Kedia — lapsed, 1.5 km away
- Mining project by M/s . S. N. Minerals Proprietor Sima Kedia — cleared for impact study, 1.5 km away
- Mining project by M/s . S. N. Minerals — lapsed, 1.5 km away
- Mining project by M/s. Shri Shyam Minerals Prop. Deepak Singhal — environmental approval granted, 1.6 km away
More from Green Sustainable Manufacturing Private Limited in Raigarh
All 5 Green Sustainable Manufacturing projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.