More information requestedBuildings & townships · Raigarh, Chhattisgarh

Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum) by Green Sustainable Manufacturing Pvt. Ltd

Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum) by Green Sustainable Manufacturing Pvt. Ltd is a proposed building project in Dhaurabhola, Sarangarh, Raigarh, Chhattisgarh. The site covers 496.4 acres. Its stated project cost is ₹268 crore. As of 27 Nov 2026, its status is “More information requested” (since 4 Jun 2025).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum) by Green Sustainable Manufacturing Pvt. Ltd is a proposed building project in Dhaurabhola, Sarangarh, Raigarh, Chhattisgarh. The site covers 496.4 acres.

Who is building it?

The applicant is Green Sustainable Manufacturing Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Dhaurabhola, Sarangarh, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹268 crore and a site of 496.4 acres.

When was it filed?

The application was filed on 4 Jun 2025.

One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone…

Project details

Official titleProposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum); along with installation of 700 TPH Crusher at Village- Laladhurwa,Jognipali,Kapisda,Sarsara & Dhaura Bhatha, Tehsil- Sarangarh, District- Sarangarh-Bilaigarh (Earlier Raigarh), State- Chhattisgarh, by Green Sustainable Manufacturing Pvt. Ltd
StatusMore information requested
Status since4 Jun 2025
Application filed4 Jun 2025
Approval soughtWildlife review
Application typeNew project
SectorBuildings & townships
ApplicantGreen Sustainable Manufacturing Private Limited
Land area496.4 acres (200.9 ha)
Project cost₹268 crore
Village / localityDhaurabhola
Taluk / tehsilSarangarh
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-04245

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Sept 2026Under environmental review496.4 acres₹268 crore
New project filed 10 Jul 2025Under forest review496.4 acres₹268 crore
New project filed 4 Jun 2025 (this page)More information requested496.4 acres₹268 crore
Early planning filed 22 Apr 2024Cleared for impact study496.4 acres₹268 crore

In context

13 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 3 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 496.4 acres, this one is larger than 77% of them.

54 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhaurabhola, Sarangarh, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Green Sustainable Manufacturing Private Limited in Raigarh

All 5 Green Sustainable Manufacturing projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.