Quick answers
What is this project?
Steel plant consists of DRI Kilns of 4x600TPD(Sponge Iron-7,92,000TPA),Induction Furnaces(with CCM, LRF, AOD,VD)of12x20T(MS Billets-9,24,000TPA),Rolling Mill with RHF & Coal Gasifier(Rolled Products–7,00,000TPA),Coal Gasifier of 222MNm3/Annum,Submerged Electric Arc Furnaces of 4x12MVA(FeMn-85,800TPA/SiMn–72,600TPA),44MW of WHRB Power Plant(4x11MW)& 136MW of AFBC Power Plant(2x19MW&2x30MW&1x38 MW),Wire Drawing Mill(HB Wire-2,00,000 TPA),FlyAshBrickManufacturing Unit(7,00,000TPA) is a lapsed industrial project in Akoli, Berla, Bametara, Chhattisgarh. The site covers 195.8 acres.
Who is building it?
The applicant is Sarda Energy & Minerals Limited.
Has it been approved?
No. The application was lapsed on 29 Jun 2025, so it is no longer under consideration.
Where is it?
In Akoli, Berla, Bametara, Chhattisgarh.
How big is it?
It has a stated cost of ₹2,370 crore and a site of 195.8 acres.
When was it filed?
The application was filed on 20 May 2025.
Project details
| Official title | Establishment of Steel plant consists of DRI Kilns of 4x600TPD(Sponge Iron-7,92,000TPA),Induction Furnaces(with CCM, LRF, AOD,VD)of12x20T(MS Billets-9,24,000TPA),Rolling Mill with RHF & Coal Gasifier(Rolled Products–7,00,000TPA),Coal Gasifier of 222MNm3/Annum,Submerged Electric Arc Furnaces of 4x12MVA(FeMn-85,800TPA/SiMn–72,600TPA),44MW of WHRB Power Plant(4x11MW)& 136MW of AFBC Power Plant(2x19MW&2x30MW&1x38 MW),Wire Drawing Mill(HB Wire-2,00,000 TPA),FlyAshBrickManufacturing Unit(7,00,000TPA) |
|---|---|
| Status | Lapsed |
| Status since | 29 Jun 2025 |
| Application filed | 20 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sarda Energy & Minerals Limited |
| Land area | 195.8 acres (79.2 ha) |
| Project cost | ₹2,370 crore |
| Village / locality | Akoli |
| Taluk / tehsil | Berla |
| District | Bametara |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02486 |
In context
24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 195.8 acres, this one is larger than 88% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Akoli, Berla, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Steel Plant [DRI Plant(627000TPA), Steel Melting… — environmental approval granted, 3.2 km away
- Proposed Integrated Steel Plant [DRI Plant(627000TPA), Steel Melting… — cleared for impact study, 3.2 km away
- Proposed Greenfield Project for installation of manufacturing facilities for… — lapsed, 5.7 km away
- Proposed Heavy Structural Steel Fabrication Facility - Zetwerk Manufacturing… — under environmental review, 9.1 km away
- Bargaon Brick Eirth Clay Quarry — environmental approval granted, 9.5 km away
- Proposed Greenfield Project for installation of manufacturing facilities for… — environmental approval granted, 9.6 km away
- Integration of Contiguous Land Area With No Change in Configuration of Plant… — initial checks, 9.7 km away
- Proposed Greenfield Project for installation of manufacturing facilities for… — environmental approval granted, 9.7 km away
All 20 Sarda Energy & Minerals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.