Cleared for impact studyIndustry · Bametara, Chhattisgarh

Proposed Integrated Steel Plant [DRI Plant(627000TPA), Steel Melting Shop(462000TPA), Rolling Mill (350000TPA), Captive Power Plant 70MW(40MW WHRB & 30MW AFBC Boiler), Ferro Alloy Plant [Si-Mn(85800TPA)/Fe-Mn(76000TPA)/Fe-Si(48000TPA)/Pig Iron(40000TPA)], HB Wire Drawing Unit (200000TPA), Fabrication Unit (120000TPA), Galvanizing Unit (1.2LTPA) & Fly Ash Brick Manufacturing Unit (3LTPA)] by M/s Arham Ispat Private Limited

Proposed Integrated Steel Plant [DRI Plant(627000TPA), Steel Melting Shop(462000TPA), Rolling Mill (350000TPA), Captive Power Plant 70MW(40MW WHRB & 30MW AFBC Boiler), Ferro Alloy Plant [Si-Mn(85800TPA)/Fe-Mn(76000TPA)/Fe-Si(48000TPA)/Pig Iron(40000TPA)], HB Wire Drawing Unit (200000TPA), Fabrication Unit (120000TPA), Galvanizing Unit (1.2LTPA) & Fly Ash Brick Manufacturing Unit (3LTPA)] by M/s Arham Ispat Private Limited is a proposed industrial project in Nevnara, Berla, Bametara, Chhattisgarh. The site covers 348.8 acres. Its stated project cost is ₹495 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Jan 2025).

See it on the live map All projects in Bametara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Integrated Steel Plant [DRI Plant(627000TPA), Steel Melting Shop(462000TPA), Rolling Mill (350000TPA), Captive Power Plant 70MW(40MW WHRB & 30MW AFBC Boiler), Ferro Alloy Plant [Si-Mn(85800TPA)/Fe-Mn(76000TPA)/Fe-Si(48000TPA)/Pig Iron(40000TPA)], HB Wire Drawing Unit (200000TPA), Fabrication Unit (120000TPA), Galvanizing Unit (1.2LTPA) & Fly Ash Brick Manufacturing Unit (3LTPA)] by M/s Arham Ispat Private Limited is a proposed industrial project in Nevnara, Berla, Bametara, Chhattisgarh. The site covers 348.8 acres.

Who is building it?

The applicant is Arham Ispat Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 28 Jan 2025), as of 27 Nov 2026.

Where is it?

In Nevnara, Berla, Bametara, Chhattisgarh.

How big is it?

It has a stated cost of ₹495 crore and a site of 348.8 acres.

When was it filed?

The application was filed on 21 Jan 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Integrated Steel Plant [DRI Plant(627000TPA), Steel Melting Shop(462000TPA),…

Project details

Official titleProposed Integrated Steel Plant [DRI Plant(627000TPA), Steel Melting Shop(462000TPA), Rolling Mill (350000TPA), Captive Power Plant 70MW(40MW WHRB & 30MW AFBC Boiler), Ferro Alloy Plant [Si-Mn(85800TPA)/Fe-Mn(76000TPA)/Fe-Si(48000TPA)/Pig Iron(40000TPA)], HB Wire Drawing Unit (200000TPA), Fabrication Unit (120000TPA), Galvanizing Unit (1.2LTPA) & Fly Ash Brick Manufacturing Unit (3LTPA)] at Village Neonara, Tehsil Bhimbhauri, District Bemetara, Chhattisgarh by M/s Arham Ispat Private Limited
StatusCleared for impact study
Status since28 Jan 2025
Application filed21 Jan 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantArham Ispat Private Limited
Land area348.8 acres (141.1 ha)
Project cost₹495 crore
Village / localityNevnara
Taluk / tehsilBerla
DistrictBametara
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02576

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 5 Sept 2026Environmental approval granted348.8 acres₹495 crore
Early planning filed 21 Jan 2025 (this page)Cleared for impact study348.8 acres₹495 crore

In context

24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 348.8 acres, this one is larger than 92% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nevnara, Berla, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.