Quick answers
What is this project?
Greenfield steel plant comprising of I/O Beneficiation Plant-2.4 MTPA (throughput), Pellet Plant-1.8 MTPA, PGP for Pellet Plant – 6 x 6250 M3/Hr, PCI Unit – 1 x 5 TPH, submerged Electric Arc Furnace of 1 x 9 MVA to produce (FeSi – 7,000 TPA/ FeMn – 20,000 TPA/ SiMn – 14,000 TPA) is a withdrawn industrial project in Barda, Dondi Luhara, Balod, Chhattisgarh. The site covers 109.6 acres.
Who is building it?
The applicant is Pera Mining Industries LLP.
Has it been approved?
No. The application was withdrawn on 6 Oct 2025, so it is no longer under consideration.
Where is it?
In Barda, Dondi Luhara, Balod, Chhattisgarh.
How big is it?
It has a stated cost of ₹410 crore and a site of 109.6 acres.
When was it filed?
The application was filed on 6 Oct 2025.
Project details
| Official title | Establishment of Greenfield steel plant comprising of I/O Beneficiation Plant-2.4 MTPA (throughput), Pellet Plant-1.8 MTPA, PGP for Pellet Plant – 6 x 6250 M3/Hr, PCI Unit – 1 x 5 TPH, submerged Electric Arc Furnace of 1 x 9 MVA to produce (FeSi – 7,000 TPA/ FeMn – 20,000 TPA/ SiMn – 14,000 TPA). |
|---|---|
| Status | Withdrawn |
| Status since | 6 Oct 2025 |
| Application filed | 6 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Pera Mining Industries LLP |
| Land area | 109.6 acres (44.4 ha) |
| Project cost | ₹410 crore |
| Village / locality | Barda |
| Taluk / tehsil | Dondi Luhara |
| District | Balod |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02495 |
In context
6 applications in Balod since January 2022 are in the same category (Industry): 3 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barda, Dondi Luhara, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ujiyar Singh Pawar — lapsed, 1.8 km away
- Greenfield Steel Plant by PERA MINING INDUSTRIES LLP--- I/O Beneficiation… — cleared for impact study, 7.9 km away
- Chhedilal chakradhari Bricks Earth Mine Area 3.81 Hec. — environmental approval granted, 7.9 km away
- Greenfield Steel Plant by PERA MINING INDUSTRIES LLP--- I/O Beneficiation… — under environmental review, 12 km away
- Steel plant comprising of I/O Beneficiation Plant-2.4 MTPA (throughput),… — withdrawn, 12 km away
- M/s Laxmi Devi Godwani Brick Earth Mine — environmental approval granted, 14.8 km away
- Greenfield Steel Plant - I/O Beneficiation Plant-2.4 MTPA, Pellet Plant-1.8… — returned to applicant, 14.9 km away
- Jitendra Kumar Dhimar — environmental approval granted, 15.5 km away
More from Pera Mining Industries LLP in Balod
- Greenfield Steel Plant by PERA MINING INDUSTRIES LLP--- I/O Beneficiation… — under environmental review
- Greenfield Steel Plant by PERA MINING INDUSTRIES LLP--- I/O Beneficiation… — cleared for impact study
- Greenfield Steel Plant - I/O Beneficiation Plant-2.4 MTPA, Pellet Plant-1.8… — returned to applicant
- Steel plant comprising of I/O Beneficiation Plant-2.4 MTPA (throughput),… — withdrawn
All 5 Pera Mining Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.