What is Developing? Open the mapMap

WithdrawnIndustry · Balod, Chhattisgarh

Greenfield steel plant comprising of I/O Beneficiation Plant-2.4 MTPA (throughput), Pellet Plant-1.8 MTPA, PGP for Pellet Plant – 6 x 6250 M3/Hr, PCI Unit – 1 x 5 TPH, submerged Electric Arc Furnace of 1 x 9 MVA to produce (FeSi – 7,000 TPA/ FeMn – 20,000 TPA/ SiMn – 14,000 TPA)

Greenfield steel plant comprising of I/O Beneficiation Plant-2.4 MTPA (throughput), Pellet Plant-1.8 MTPA, PGP for Pellet Plant – 6 x 6250 M3/Hr, PCI Unit – 1 x 5 TPH, submerged Electric Arc Furnace of 1 x 9 MVA to produce (FeSi – 7,000 TPA/ FeMn – 20,000 TPA/ SiMn – 14,000 TPA) is a withdrawn industrial project in Barda, Dondi Luhara, Balod, Chhattisgarh. The site covers 109.6 acres. Its stated project cost is ₹410 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 6 Oct 2025).

See it on the live map All projects in Balod

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield steel plant comprising of I/O Beneficiation Plant-2.4 MTPA (throughput), Pellet Plant-1.8 MTPA, PGP for Pellet Plant – 6 x 6250 M3/Hr, PCI Unit – 1 x 5 TPH, submerged Electric Arc Furnace of 1 x 9 MVA to produce (FeSi – 7,000 TPA/ FeMn – 20,000 TPA/ SiMn – 14,000 TPA) is a withdrawn industrial project in Barda, Dondi Luhara, Balod, Chhattisgarh. The site covers 109.6 acres.

Who is building it?

The applicant is Pera Mining Industries LLP.

Has it been approved?

No. The application was withdrawn on 6 Oct 2025, so it is no longer under consideration.

Where is it?

In Barda, Dondi Luhara, Balod, Chhattisgarh.

How big is it?

It has a stated cost of ₹410 crore and a site of 109.6 acres.

When was it filed?

The application was filed on 6 Oct 2025.

Project details

Official titleEstablishment of Greenfield steel plant comprising of I/O Beneficiation Plant-2.4 MTPA (throughput), Pellet Plant-1.8 MTPA, PGP for Pellet Plant – 6 x 6250 M3/Hr, PCI Unit – 1 x 5 TPH, submerged Electric Arc Furnace of 1 x 9 MVA to produce (FeSi – 7,000 TPA/ FeMn – 20,000 TPA/ SiMn – 14,000 TPA).
StatusWithdrawn
Status since6 Oct 2025
Application filed6 Oct 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantPera Mining Industries LLP
Land area109.6 acres (44.4 ha)
Project cost₹410 crore
Village / localityBarda
Taluk / tehsilDondi Luhara
DistrictBalod
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02495

In context

6 applications in Balod since January 2022 are in the same category (Industry): 3 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barda, Dondi Luhara, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pera Mining Industries LLP in Balod

All 5 Pera Mining Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.