Under environmental reviewIndustry · Balod, Chhattisgarh

Greenfield Steel Plant by PERA MINING INDUSTRIES LLP--- I/O Beneficiation Plant-2.4 MTPA, Pellet Plant-1.8 MTPA, Sponge Iron- 11,88,000 TPA, Hot Billets/Ingots (EAF)-10,29,600 TPA, Rolling Mill-(Strip mill, Structural Mill, TMT mill), PGP-5 x 6500 Nm3/hr, PCI Unit–1 x 5 TPH, SEAFs of 2 x 9 MVA (FeSi/ FeMn/SiMn/FeCr/Pig Iron), Briquetting Plant-200 kg/hr, WHRB–6x18 MW, CFBC–2x50 MW, Fly Ash Brick-1,00,000 Bricks/Day

Greenfield Steel Plant by PERA MINING INDUSTRIES LLP--- I/O Beneficiation Plant-2.4 MTPA, Pellet Plant-1.8 MTPA, Sponge Iron- 11,88,000 TPA, Hot Billets/Ingots (EAF)-10,29,600 TPA, Rolling Mill-(Strip mill, Structural Mill, TMT mill), PGP-5 x 6500 Nm3/hr, PCI Unit–1 x 5 TPH, SEAFs of 2 x 9 MVA (FeSi/ FeMn/SiMn/FeCr/Pig Iron), Briquetting Plant-200 kg/hr, WHRB–6x18 MW, CFBC–2x50 MW, Fly Ash Brick-1,00,000 Bricks/Day is a proposed industrial project in Barda, Dondi Luhara, Balod, Chhattisgarh. The site covers 136.1 acres. Its stated project cost is ₹3,527 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 22 Nov 2026).

See it on the live map All projects in Balod

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Steel Plant by PERA MINING INDUSTRIES LLP--- I/O Beneficiation Plant-2.4 MTPA, Pellet Plant-1.8 MTPA, Sponge Iron- 11,88,000 TPA, Hot Billets/Ingots (EAF)-10,29,600 TPA, Rolling Mill-(Strip mill, Structural Mill, TMT mill), PGP-5 x 6500 Nm3/hr, PCI Unit–1 x 5 TPH, SEAFs of 2 x 9 MVA (FeSi/ FeMn/SiMn/FeCr/Pig Iron), Briquetting Plant-200 kg/hr, WHRB–6x18 MW, CFBC–2x50 MW, Fly Ash Brick-1,00,000 Bricks/Day is a proposed industrial project in Barda, Dondi Luhara, Balod, Chhattisgarh. The site covers 136.1 acres.

Who is building it?

The applicant is Pera Mining Industries LLP.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Barda, Dondi Luhara, Balod, Chhattisgarh.

How big is it?

It has a stated cost of ₹3,527 crore and a site of 136.1 acres.

When was it filed?

The application was filed on 21 Nov 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Steel Plant by PERA MINING INDUSTRIES LLP--- I/O Beneficiation Plant-2.4…

Project details

StatusUnder environmental review
Status since22 Nov 2026
Application filed21 Nov 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantPera Mining Industries LLP
Land area136.1 acres (55.1 ha)
Project cost₹3,527 crore
Village / localityBarda
Taluk / tehsilDondi Luhara
DistrictBalod
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03428

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 21 Nov 2026 (this page)Under environmental review136.1 acres₹3,527 crore
Early planning filed 4 Feb 2026Cleared for impact study104.1 acres₹490 crore

In context

6 applications in Balod since January 2022 are in the same category (Industry): 3 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barda, Dondi Luhara, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pera Mining Industries LLP in Balod

All 5 Pera Mining Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.