Cleared for impact studyMining · Raigarh, Chhattisgarh

Gare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00 ha) with combined Coal Production Capacity: 15.00 Million TPA by Opencast and Underground Mining method

Gare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00 ha) with combined Coal Production Capacity: 15.00 Million TPA by Opencast and Underground Mining method is a proposed mining project in Tilaipara, Tamnar, Raigarh, Chhattisgarh. The site covers 7,462.6 acres. Its stated project cost is ₹9,504.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Apr 2025).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Gare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00 ha) with combined Coal Production Capacity: 15.00 Million TPA by Opencast and Underground Mining method is a proposed mining project in Tilaipara, Tamnar, Raigarh, Chhattisgarh. The site covers 7,462.6 acres.

Who is building it?

The applicant is Jindal Power Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 28 Apr 2025), as of 27 Nov 2026.

Where is it?

In Tilaipara, Tamnar, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹9,504.7 crore and a site of 7,462.6 acres.

When was it filed?

The application was filed on 11 Mar 2025.

Project details

Official titleGare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00 ha) with combined Coal Production Capacity: 15.00 Million TPA by Opencast and Underground Mining method at Tehsil: Tamnar, District: Raigarh, Chhattisgarh by M/s. Jindal Power Limited (JPL).
StatusCleared for impact study
Status since28 Apr 2025
Application filed11 Mar 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantJindal Power Limited
Land area7,462.6 acres (3,020 ha)
Project cost₹9,504.7 crore
Village / localityTilaipara
Taluk / tehsilTamnar
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02519

In context

230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 7,462.6 acres, this one is larger than 97% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 22,387.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.

Where it is

Tilaipara, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jindal Power Limited in Raigarh

23 Jindal Power projects in Raigarh
All 27 Jindal Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.