What is Developing? Open the mapMap

Under forest reviewMining · Raigarh, Chhattisgarh

Diversion of 119.277 ha. Forest land in Gare Palma Sector-I Coal Mine (Block Area: 3020 ha.) with production capacity: 15 Million TPA by Opencast & Underground Coal Mining method

Diversion of 119.277 ha. Forest land in Gare Palma Sector-I Coal Mine (Block Area: 3020 ha.) with production capacity: 15 Million TPA by Opencast & Underground Coal Mining method is a proposed mining project in Budia, Tamnar, Raigarh, Chhattisgarh. The site covers 7,462.6 acres. Its stated project cost is ₹9,504.7 crore. As of 27 Nov 2026, its status is “Under forest review” (since 7 Nov 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 119.277 ha. Forest land in Gare Palma Sector-I Coal Mine (Block Area: 3020 ha.) with production capacity: 15 Million TPA by Opencast & Underground Coal Mining method is a proposed mining project in Budia, Tamnar, Raigarh, Chhattisgarh. The site covers 7,462.6 acres.

Who is building it?

The applicant is Jindal Power Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Budia, Tamnar, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹9,504.7 crore; a site of 7,462.6 acres and 294.7 acres (119.3 ha) of forest land.

When was it filed?

The application was filed on 4 Aug 2025.

Project details

Official titleDiversion of 119.277 ha. Forest land in Gare Palma Sector-I Coal Mine (Block Area: 3020 ha.) with production capacity: 15 Million TPA by Opencast & Underground Coal Mining method at Tehsil: Tamnar, District: Raigarh, Chhattisgarh by M/s. Jindal Power Limited (JPL)
StatusUnder forest review
Status since7 Nov 2026
Application filed4 Aug 2025
Approval soughtForest land use
Application typeNew project
SectorMining
ApplicantJindal Power Limited
Land area7,462.6 acres (3,020 ha)
Forest land294.7 acres (119.3 ha)
Project cost₹9,504.7 crore
Village / localityBudia
Taluk / tehsilTamnar
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03932

In context

230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 7,462.6 acres, this one is larger than 97% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 22,387.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.

Where it is

Budia, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jindal Power Limited in Raigarh

23 Jindal Power projects in Raigarh
All 27 Jindal Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.