Project details
| Official title | Installation of 71,000 TPA Coal Tar Distillation Plant for manufacture of Coal Tar Pitch 40,800 TPA (Binder Grade Pitch), Heavy & Light Creosote Mixed Oils 29,700 TPA and Moisture 500 TPA |
|---|---|
| Status | Environmental approval granted |
| Status since | 2 Apr 2026 |
| Application filed | 16 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Tethys Hydrocarbon Private Limited |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹9 crore |
| Village / locality | Durg |
| Taluk / tehsil | Durg |
| District | Durg |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02706 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Sept 2025 (this page) | Environmental approval granted | 2 acres | ₹9 crore |
| Early planning filed 23 Sept 2024 | Cleared for impact study | 2 acres | ₹9 crore |
In context
41 applications in Durg since January 2022 are in the same category (Industry): 25 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2 acres, this one is smaller than 90% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Durg, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 71,000 TPA Coal Tar Distillation Plant for manufacture of Coal Tar Pitch… — cleared for impact study, 0 m away
- Proposal to manufacture Aromatic chemicals in the existing Essential oil and… — more information requested, 1.3 km away
- Transfer of Environment Clearance From Niros Ispat Private Limited to Vishv… — environmental approval granted, 1.3 km away
- Proposed Capacity Expansion of Sponge Iron (97,500 TPA to 140,000 TPA); MS… — environmental approval granted, 1.3 km away
- Proposed Coal Tar Distillation Plant Expansion From 2300 Tpa to 65,000 Tpa for… — under environmental review, 1.3 km away
- Proposed Coal Tar Distillation Plant Expansion From 2300 Tpa to 65,000 Tpa for… — cleared for impact study, 1.3 km away
- Proposed Expansion of Existing Coal Tar Distillation Plant to Manufacture… — more information requested, 1.5 km away
- Proposed Expansion of Existing Coal Tar Distillation Plant to Manufacture… — cleared for impact study, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.