One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Coal Tar Distillation Plant Expansion From 2300 Tpa to 65,000 Tpa for…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 20 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Tethys Chem Private Limited |
| Land area | 3,700 m² |
| Project cost | ₹4.3 crore |
| Village / locality | Durg |
| Taluk / tehsil | Durg |
| District | Durg |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02735 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 20 Jan 2025 (this page) | Under environmental review | 0.9 acres | ₹4.3 crore |
| Early planning filed 8 Jun 2024 | Cleared for impact study | 0.9 acres | ₹4.3 crore |
In context
41 applications in Durg since January 2022 are in the same category (Industry): 25 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.9 acres, this one is smaller than 95% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Durg, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Coal Tar Distillation Plant Expansion From 2300 Tpa to 65,000 Tpa for… — cleared for impact study, 0 m away
- Proposed Expansion of Existing Coal Tar Distillation Plant to Manufacture… — more information requested, 200 m away
- Proposed Expansion of Existing Coal Tar Distillation Plant to Manufacture… — cleared for impact study, 200 m away
- Transfer of Environment Clearance From Niros Ispat Private Limited to Vishv… — environmental approval granted, 300 m away
- Proposed Capacity Expansion of Sponge Iron (97,500 TPA to 140,000 TPA); MS… — environmental approval granted, 300 m away
- Expansion in existing Coal Tar Processing Unit at Plot No.- 12-I, 13/D, Heavy… — more information requested, 650 m away
- Expansion in existing Coal Tar Processing Unit at Plot No.- 12-I, 13/D, Heavy… — lapsed, 650 m away
- Proposed Expansion of Coal Tar Distillation Project to Manufacture 75,000 TPA… — more information requested, 750 m away