Project details
| Status | More information requested |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 28 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kamal Kumar Sain |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹7.1 crore |
| Village / locality | Hathkhoj |
| Taluk / tehsil | Durg |
| District | Durg |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03607 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 28 Mar 2026 (this page) | More information requested | 2.5 acres | ₹7.1 crore |
| Early planning filed 1 Aug 2025 | Lapsed | 2.5 acres | ₹7.1 crore |
In context
41 applications in Durg since January 2022 are in the same category (Industry): 25 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 85% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hathkhoj, Durg, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in existing Coal Tar Processing Unit at Plot No.- 12-I, 13/D, Heavy… — lapsed, 0 m away
- Proposed Expansion of Coal Tar Distillation Project to Manufacture 75,000 TPA… — more information requested, 150 m away
- Proposed Expansion of Coal Tar Distillation Project to Manufacture 75,000 TPA… — cleared for impact study, 150 m away
- Transfer of Environment Clearance From Niros Ispat Private Limited to Vishv… — environmental approval granted, 400 m away
- Proposed Capacity Expansion of Sponge Iron (97,500 TPA to 140,000 TPA); MS… — environmental approval granted, 400 m away
- Proposed Expansion of Existing Coal Tar Distillation Plant to Manufacture… — more information requested, 550 m away
- Proposed Expansion of Existing Coal Tar Distillation Plant to Manufacture… — cleared for impact study, 550 m away
- Proposed Coal Tar Distillation Plant Expansion From 2300 Tpa to 65,000 Tpa for… — under environmental review, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.