What is this project?
Expansion of Steel Plant–DRI Kilns(Sponge Iron-1,98,000TPA to 3,96,000TPA),Induction Furnaces with LRF&CCM (MS Billets/Ingots)-3,45,800 TPA,Re-Rolling Mill(TMT Bars/Structural Steel Strips/Wire rod- 3,42,144 TPA(1,74,636TPA-Hot charging&1,67,508TPA-RHF),SEAF-2x9 MVAto4x9MVA(Ferro Alloys),Pipe Mill Unit-1,50,000 TPA,Galvanized Pipes-1,00,000TPA,WHRB Power Plant-12 MWto32MW,FBC Power Plant-8.0MW to28 MW,Fly Ash Bricks/Block making unit-34,600to1,24,600 Bricks/day& New Briquette Plant-400 Kg/Hr is a proposed industrial project in Madhi, Tilda, Raipur, Chhattisgarh. The site covers 79.6 acres.
Who is building it?
The applicant is Gauri Ganesh Ispat Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Nov 2025), as of 27 Nov 2026.
Where is it?
In Madhi, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹822.1 crore and a site of 79.6 acres.
When was it filed?
The application was filed on 8 Nov 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Nov 2025 |
| Application filed | 8 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Gauri Ganesh Ispat Private Limited |
| Land area | 79.6 acres (32.2 ha) |
| Project cost | ₹822.1 crore |
| Village / locality | Madhi |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02765 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 20 Nov 2026 | Under environmental review | 79.6 acres | ₹822.1 crore |
| Early planning filed 8 Nov 2025 (this page) | Cleared for impact study | 79.6 acres | ₹822.1 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 79.6 acres, this one is larger than 81% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Madhi, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Steel Plant–DRI Kilns(Sponge Iron-1,98,000TPA to… — under environmental review, 0 m away
- Amendment in Environmental Clearance Condition issued to M/s. GAURI GANESH… — environmental approval granted, 50 m away
- Amendment in Clearance Condition issued to M/s. GAURI GANESH ISPAT PVT. LTD. — withdrawn, 100 m away
- Sponge Iron unit (2,25,000 TPA), Induction Furnace with matching LRF & CCM… — environmental approval granted, 2 km away
- Green Field Project 2.2 MTPA Integrated Steel Plant at Khasra No. 746, 747,… — more information requested, 2 km away
- Industrial project by Anjani wires Pvt. Ltd. — more information requested, 2.2 km away
- Transfer of Environment Clearance vide no. IA-J-11011/278/2020-IA-II(IND-I)… — environmental approval granted, 2.7 km away
- Sponge Iron unit (1,32,000 TPA), Induction Furnace with matching LRF & CCM… — environmental approval granted, 2.7 km away
More from Gauri Ganesh Ispat Private Limited in Raipur
- Amendment in Environmental Clearance Condition issued to M/s. GAURI GANESH… — environmental approval granted
- Amendment in Clearance Condition issued to M/s. GAURI GANESH ISPAT PVT. LTD. — withdrawn
All 4 Gauri Ganesh Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.