Quick answers
What is this project?
Green Field Project 2.2 MTPA Integrated Steel Plant at Khasra No. 746, 747, 1320, 1322/1 and 1322/3, Village- Sarora, Tahsil- Tilda, District- Raipur, Chhattisgarh by M/s Godawari Power & Ispat Limited is a proposed industrial project in Sarora, Tilda, Raipur, Chhattisgarh. The site covers 1,801.6 acres.
Who is building it?
The applicant is Godawari Power and Ispat Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Sarora, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹5,000 crore and a site of 1,801.6 acres.
When was it filed?
The application was filed on 2 Oct 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 27 Oct 2026 |
| Application filed | 2 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Godawari Power and Ispat Limited |
| Land area | 1,801.6 acres (729.1 ha) |
| Project cost | ₹5,000 crore |
| Village / locality | Sarora |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01665 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,801.6 acres, this one is larger than 100% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarora, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environmental Clearance Condition issued to M/s. GAURI GANESH… — environmental approval granted, 2 km away
- Expansion of Steel Plant–DRI Kilns(Sponge Iron-1,98,000TPA to… — under environmental review, 2 km away
- Expansion of Steel Plant–DRI Kilns(Sponge Iron-1,98,000TPA to… — cleared for impact study, 2 km away
- Amendment in Clearance Condition issued to M/s. GAURI GANESH ISPAT PVT. LTD. — withdrawn, 2.1 km away
- Transfer of Environment Clearance vide no. IA-J-11011/88/2023-IA-II(IND-I) dt.… — environmental approval granted, 2.8 km away
- Proposed Change in the DRI plant configuration from 2 x 200 TPD Kilns to 1 x… — initial checks, 2.8 km away
- Greenfield Steel plant comprising of Establishment of DRI Kilns (Sponge Iron –… — environmental approval granted, 2.8 km away
- Greenfield Steel plant comprising of Establishment of DRI Kilns (Sponge Iron –… — cleared for impact study, 2.8 km away
More from Godawari Power and Ispat Limited in Raipur
- Enhancement in production of Sponge Iron from 650000 TPA to 715000 TPA through… — initial checks
- Proposal seeking change in configuration of the proposed Induction Furnaces of… — initial checks
- Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657… — environmental approval granted
- Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657… — environmental approval granted
- Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657… — cleared for impact study
6 Godawari Power and Ispat projects in Raipur
All 13 Godawari Power and Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.