Quick answers
What is this project?
Expansion of Steel Plant – DRI Kilns (Sponge Iron from 1,20,000 TPA to 6,48,000 TPA), Induction Furnaces is an approved industrial project in Saraipali, Tamnar, Raigarh, Chhattisgarh. The site covers 81.3 acres.
Who is building it?
The applicant is Shree Rupanadham Steel PVT LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Jun 2026), as of 27 Nov 2026.
Where is it?
In Saraipali, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹862 crore and a site of 81.3 acres.
When was it filed?
The application was filed on 18 Oct 2025.
Project details
| Official title | Expansion of Steel Plant – DRI Kilns (Sponge Iron from 1,20,000 TPA to 6,48,000 TPA), Induction Furnaces along with CCM & LRF (Hot Billets / Billets / Ingots from 1,23,500 TPA to 4,53,000TPA), Rolling Mills (TMT bars / Structural Steel / Wire Rod Mill with HB Wire cooled Roll & Strip Mill with Pipe Mill)(85 % Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel from 94,800 TPA to 5,30,400 TPA), WHRB based Power Plant from 8 MW to 44 MW, FBC based Power Plant from 4 MW to |
|---|---|
| Status | Environmental approval granted |
| Status since | 30 Jun 2026 |
| Application filed | 18 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Shree Rupanadham Steel PVT LTD |
| Land area | 81.3 acres (32.9 ha) |
| Project cost | ₹862 crore |
| Village / locality | Saraipali |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02847 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 81.3 acres, this one is larger than 50% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saraipali, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Splitting of EC facilities issued to M/s. Shree Rupanadham Steel Pvt. Ltd.… — under environmental review, 50 m away
- Industrial project by Shri Dayal Industries Pvt. Ltd. — more information requested, 400 m away
- Proposed expansion by Installation of Production Facilities for: Sponge Iron… — initial checks, 450 m away
- Proposed expansion by Installation of Production Facilities for: Sponge Iron… — environmental approval granted, 450 m away
- Proposed expansion by Installation of Production Facilities for: Sponge Iron… — cleared for impact study, 450 m away
- Amendment in Environmental Clearance for 100 KLPD Grain Based Ethanol Plant by… — more information requested, 650 m away
- Capacity enhancement of Rolling Mill from 100000 TPA to 135000 TPA — initial checks, 750 m away
- Proposed Expansion of existing steel plant by increasing of existing Sponge… — more information requested, 750 m away
More from Shree Rupanadham Steel PVT LTD in Raigarh
- Splitting of EC facilities issued to M/s. Shree Rupanadham Steel Pvt. Ltd.… — under environmental review
All 3 Shree Rupanadham Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.