What is Developing? Open the mapMap

More information requestedIndustry · Raigarh, Chhattisgarh

Proposed Expansion of existing steel plant by increasing of existing Sponge Iron Plant capacity from 90,000 TPA to 1,56,000 TPA, Coal washery capacity from 0.3 MTPA to 1.8 MTPA, Steel Making capacity from 79,200 TPA to 2,64,000 TPA, Rolling Mill Capacity from 1,35,000 TPA to 3,85,000 TPA, Captive Power Generation capacity from 11 MW (WHRB - 6 MW + AFBC - 5 MW) to 65 MW (WHRB - 10 MW + CFBC/AFBC - 55 MW) and by installation of 2X9 MVA Ferro- Alloys Plant

Proposed Expansion of existing steel plant by increasing of existing Sponge Iron Plant capacity from 90,000 TPA to 1,56,000 TPA, Coal washery capacity from 0.3 MTPA to 1.8 MTPA, Steel Making capacity from 79,200 TPA to 2,64,000 TPA, Rolling Mill Capacity from 1,35,000 TPA to 3,85,000 TPA, Captive Power Generation capacity from 11 MW (WHRB - 6 MW + AFBC - 5 MW) to 65 MW (WHRB - 10 MW + CFBC/AFBC - 55 MW) and by installation of 2X9 MVA Ferro- Alloys Plant is a proposed industrial project in Barpali, Tamnar, Raigarh, Chhattisgarh. The site covers 113.1 acres. Its stated project cost is ₹880 crore. As of 27 Nov 2026, its status is “More information requested” (since 27 Oct 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of existing steel plant by increasing of existing Sponge Iron Plant capacity from 90,000 TPA to 1,56,000 TPA, Coal washery capacity from 0.3 MTPA to 1.8 MTPA, Steel Making capacity from 79,200 TPA to 2,64,000 TPA, Rolling Mill Capacity from 1,35,000 TPA to 3,85,000 TPA, Captive Power Generation capacity from 11 MW (WHRB - 6 MW + AFBC - 5 MW) to 65 MW (WHRB - 10 MW + CFBC/AFBC - 55 MW) and by installation of 2X9 MVA Ferro- Alloys Plant is a proposed industrial project in Barpali, Tamnar, Raigarh, Chhattisgarh. The site covers 113.1 acres.

Who is building it?

The applicant is Nav Durga Fuel Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Barpali, Tamnar, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹880 crore and a site of 113.1 acres.

When was it filed?

The application was filed on 23 Sept 2026.

Project details

StatusMore information requested
Status since27 Oct 2026
Application filed23 Sept 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantNav Durga Fuel Private Limited
Land area113.1 acres (45.8 ha)
Project cost₹880 crore
Village / localityBarpali
Taluk / tehsilTamnar
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03016

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 113.1 acres, this one is larger than 60% of them.

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barpali, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Nav Durga Fuel Private Limited in Raigarh

4 Nav Durga Fuel projects in Raigarh
All 5 Nav Durga Fuel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.