Project details
| Official title | Proposed expansion of existing sponge iron plant capacity from 30,000 TPA to 96,000 TPA, installation of new WHRB 7 MW (1x2;1x5 MW) and new AFBC/CFBC power plant -7 MW at khasra no. 657/2 (part) Village- Hardikala, Silpahari Industrial Area, District- Bilaspur, Chhattisgarh by M/s. Geetanjali Ispat & Powers Private Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 30 Jun 2026 |
| Application filed | 22 May 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Geetanjali Ispat and Powers Private Limited |
| Land area | 14.2 acres (5.7 ha) |
| Project cost | ₹67.9 crore |
| Village / locality | Hardi Kalan(Tona) |
| Taluk / tehsil | Bilha |
| District | Bilaspur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03325 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 22 May 2026 (this page) | Cleared for impact study | 14.2 acres | ₹67.9 crore |
| Early planning filed 6 Jan 2026 | Cleared for impact study | 14.2 acres | ₹61 crore |
In context
47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 14.2 acres, this one is smaller than 94% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hardi Kalan(Tona), Bilha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of existing sponge iron plant capacity from 30,000 TPA to… — cleared for impact study, 0 m away
- Industrial project by Arora (C.G.) Energy & Steel Pvt. Ltd. — environmental approval granted, 200 m away
- Application for amendment in Environment Clearance obtained for expansion of… — environmental approval granted, 250 m away
- Amendment in Clearance Condition issued to M/s. Airan Steel and Power Pvt.Ltd — environmental approval granted, 450 m away
- Expansion of Steel Plant by Increasing the existing 100 TPD Sponge Iron… — environmental approval granted, 450 m away
- Expansion-cum-Amendment of existing project of M/s NACHIKETA POWER & STEEL… — cleared for impact study, 1.1 km away
- Greenfield Wet Type Coal Washery Project Based on Heavy Media Cyclone… — cleared for impact study, 1.2 km away
- Expansion of Existing DRI-Based Integrated Steel Plant by Enhancement of… — more information requested, 1.2 km away
About this information