What is Developing? Open the mapMap

Cleared for impact studyIndustry · Bilaspur, Chhattisgarh

Proposed expansion of existing sponge iron plant capacity from 30,000 TPA to 96,000 TPA, installation of new WHRB 7 MW (1x2;1x5 MW) and new AFBC/CFBC power plant -7 MW by M/s. Geetanjali Ispat & Powers Private Limited

Proposed expansion of existing sponge iron plant capacity from 30,000 TPA to 96,000 TPA, installation of new WHRB 7 MW (1x2;1x5 MW) and new AFBC/CFBC power plant -7 MW by M/s. Geetanjali Ispat & Powers Private Limited is a proposed industrial project in Hardi Kalan(Tona), Bilha, Bilaspur, Chhattisgarh. The site covers 14.2 acres. Its stated project cost is ₹67.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Jun 2026).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed expansion of existing sponge iron plant capacity from 30,000 TPA to 96,000 TPA, installation of new WHRB 7 MW (1x2;1x5 MW) and new AFBC/CFBC power plant -7 MW at khasra no. 657/2 (part) Village- Hardikala, Silpahari Industrial Area, District- Bilaspur, Chhattisgarh by M/s. Geetanjali Ispat & Powers Private Limited
StatusCleared for impact study
Status since30 Jun 2026
Application filed22 May 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantGeetanjali Ispat and Powers Private Limited
Land area14.2 acres (5.7 ha)
Project cost₹67.9 crore
Village / localityHardi Kalan(Tona)
Taluk / tehsilBilha
DistrictBilaspur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03325

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 22 May 2026 (this page)Cleared for impact study14.2 acres₹67.9 crore
Early planning filed 6 Jan 2026Cleared for impact study14.2 acres₹61 crore

In context

47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 14.2 acres, this one is smaller than 94% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hardi Kalan(Tona), Bilha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.