Initial checksPower · Raigarh, Chhattisgarh

Proposed Change in Induction Furnaces Configuration From 3 X 15 T As Per Ec to Change 3 X 12 T (As Per Cto) & Installation of Additional 1 X 12 T Induction Furnace With Same Production Capacity As Granted in Ec Issued I.E 1,48,500 Tpa Without Increase in the Pollution Load As Compared to Environment Clearance Granted by Seiaa,cg, by Agroha Steel and Power Private Limited As Per Nipl Gazette Notification Dated 23rd November 2016, 16th January 2020 & 2nd March 2021 Issued by Ministry of Environme

Proposed Change in Induction Furnaces Configuration From 3 X 15 T As Per Ec to Change 3 X 12 T (As Per Cto) & Installation of Additional 1 X 12 T Induction Furnace With Same Production Capacity As Granted in Ec Issued I.E 1,48,500 Tpa Without Increase in the Pollution Load As Compared to Environment Clearance Granted by Seiaa,cg, by Agroha Steel and Power Private Limited As Per Nipl Gazette Notification Dated 23rd November 2016, 16th January 2020 & 2nd March 2021 Issued by Ministry of Environme is a proposed power project in Pali, Raigarh, Chhattisgarh. The site covers 6.7 acres. Its stated project cost is ₹47 lakh. As of 27 Nov 2026, its status is “Initial checks” (since 17 Feb 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Change in Induction Furnaces Configuration From 3 X 15 T As Per Ec to Change 3 X 12 T (As Per Cto) & Installation of Additional 1 X 12 T Induction Furnace With Same Production Capacity As Granted in Ec Issued I.E 1,48,500 Tpa Without Increase in the Pollution Load As Compared to Environment Clearance Granted by Seiaa,cg, by Agroha Steel and Power Private Limited As Per Nipl Gazette Notification Dated 23rd November 2016, 16th January 2020 & 2nd March 2021 Issued by Ministry of Environme is a proposed power project in Pali, Raigarh, Chhattisgarh. The site covers 6.7 acres.

Who is building it?

The applicant is Agroha Steel and Power Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Pali, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹47 lakh and a site of 6.7 acres.

When was it filed?

The application was filed on 17 Feb 2026.

Project details

StatusInitial checks
Status since17 Feb 2026
Application filed17 Feb 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorPower
ApplicantAgroha Steel and Power Private Limited
Land area6.7 acres (2.7 ha)
Project cost₹47 lakh
Village / localityPali
Taluk / tehsilRaigarh
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03394

In context

29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.7 acres, this one is smaller than 89% of them.

44 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pali, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Agroha Steel and Power Private Limited in Raigarh

All 3 Agroha Steel and Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.