Quick answers
What is this project?
Chhirbhauna Ordinary Sand Quarry, Area- 3.00 Ha., Village – Chhirbhauna, Project Proponent - Shivani Soundik is a lapsed mining project in Chhirbhona, Gharghoda, Raigarh, Chhattisgarh. The site covers 7.4 acres.
Who is building it?
The applicant is Shivani Soundik.
Has it been approved?
No. The application was lapsed on 19 Oct 2026, so it is no longer under consideration.
Where is it?
In Chhirbhona, Gharghoda, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹19 lakh and a site of 7.4 acres.
When was it filed?
The application was filed on 20 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Oct 2026 |
| Application filed | 20 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shivani Soundik |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹19 lakh |
| Village / locality | Chhirbhona |
| Taluk / tehsil | Gharghoda |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03418 |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 7.4 acres, this one is smaller than 51% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Chhirbhona, Gharghoda, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to South Eastern Coalfields Plans a 15-Million-Tonne-a-Year Coal Mine Expansion in Raigarh, Chhattisgarh (8 km away).
Other projects nearby
- Kanchanpur Ordinary Sand Quarry, Area- 2.00 Ha.,Village – Kanchanpur, Project… — under environmental review, 1.2 km away
- Karichapar Sand Mine — lapsed, 1.3 km away
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — under environmental review, 4.5 km away
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — cleared for impact study, 4.5 km away
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — cleared for impact study, 4.5 km away
- Submerged Electric Arc Furnaces -2x 9 MVA (Fesi-14,000TPA / FeMn-40,000 TPA /… — cleared for impact study, 4.6 km away
- Railway Siding — more information requested, 6.5 km away
- Railway Siding — lapsed, 6.5 km away