| Official title | Proposed installation of 1 × 800 MW Supercritical (SC) Thermal Power Unit at village Badadarha, District Sakti, Chhattisgarh by DB Power Infra Limited. |
|---|---|
| Status | Returned to applicant |
| Status since | 18 Nov 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | DB Power INfra limited |
| Land area | 237 acres (95.9 ha) |
| Project cost | ₹8,930.6 crore |
| Village / locality | Baradarha |
| Taluk / tehsil | Dabhra |
| District | Janjgir - Champa |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03619 |
In context
18 applications in Janjgir - Champa since January 2022 are in the same category (Power): 8 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 237 acres, this one is smaller than 94% of them.
Where it is
Baradarha, Dabhra, Janjgir - Champa, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Final/Stage-II Approval" under Section- 2 (i) of the Van (Sanrakshan Evam… — in-principle approval, conditions pending, 5.5 km away
- Expansion of existing 2×600 MW Sub-Critical Thermal Power Plant to 3600 MW by… — under environmental review, 5.5 km away
- Amendment in existing Environmental Clearance of 2 X 600 MW Coal based Thermal… — environmental approval granted, 5.5 km away
- Expansion of existing 2x600 MW Sub Critical TPP to 4400 MW by addition of… — returned to applicant, 5.5 km away
- Expansion of existing 2X600 MW subcritical TPP to 6800 MW by addition of 7X800… — returned to applicant, 5.5 km away
- Expansion by addition of 7 X 800 MW(5600 MW) Coal Based Ultra Super Critical… — withdrawn, 5.5 km away
- Amendment in Existing Environmental Clearance of 2 x 600 MW Coal Based Thermal… — lapsed, 5.5 km away
- 2x600 MW Coal Based Thermal Power Plant at villages Singhitarai, Benipali,… — environmental approval granted, 5.5 km away