Quick answers
What is this project?
Greenfield project of Sponge Iron 385000 TPA, Iron Ore beneficiation 1200000 TPA, Iron Ore Pellet 1200000 TPA, Rotary Hearth Furnace -nugget/briquet of Sponge Iron 210000 TPA, MS Billets 514500 TPA, Rolled Steel Products 800000 TPA (Hot Charging 500000 and BRF - 300000 TPA); Ferro Alloys (SAF 12 MVA X 2 Nos); CPP 50 MW (32 MW WHRB & 18 MW FBC) and GI Pipe 200000 TPA; GI Wire 200000 TPA and Fly Ash Bricks 75,700 TPA is a proposed industrial project in Chapa, Tilda, Raipur, Chhattisgarh. The site covers 220.6 acres.
Who is building it?
The applicant is Agrasen Steel and Power Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Chapa, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹1,065.8 crore and a site of 220.6 acres.
When was it filed?
The application was filed on 8 Sept 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield project of Sponge Iron 385000 TPA, Iron Ore beneficiation 1200000 TPA, Iron…
Project details
| Official title | Greenfield project of Sponge Iron 385000 TPA, Iron Ore beneficiation 1200000 TPA, Iron Ore Pellet 1200000 TPA, Rotary Hearth Furnace -nugget/briquet of Sponge Iron 210000 TPA, MS Billets 514500 TPA, Rolled Steel Products 800000 TPA (Hot Charging 500000 and BRF - 300000 TPA); Ferro Alloys (SAF 12 MVA X 2 Nos); CPP 50 MW (32 MW WHRB & 18 MW FBC) and GI Pipe 200000 TPA; GI Wire 200000 TPA and Fly Ash Bricks 75,700 TPA at Village – Deori and Ghulghul, Teh. - Tilda, District - Raipur (C.G.) 493 221 |
|---|---|
| Status | Under environmental review |
| Status since | 11 Nov 2026 |
| Application filed | 8 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Agrasen Steel and Power Private Limited |
| Land area | 220.6 acres (89.3 ha) |
| Project cost | ₹1,065.8 crore |
| Village / locality | Chapa |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03706 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Sept 2026 (this page) | Under environmental review | 220.6 acres | ₹1,065.8 crore |
| Early planning filed 28 May 2025 | Cleared for impact study | 220.6 acres | ₹1,065.8 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 220.6 acres, this one is larger than 91% of them.
Where it is
Chapa, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield project of Sponge Iron 385000 TPA, Iron Ore beneficiation 1200000… — cleared for impact study, 0 m away
- Greenfield project for Cement grinding unit with 1.0 MTPA PPC or PSC or OPC or… — cleared for impact study, 18.6 km away
- Proposed DRI Plant (Sponge Iron 135000 TPA), WHRB 10MW, AFBC Power Plant… — environmental approval granted, 40.4 km away
- Proposed DRI Plant (Sponge Iron 135000 TPA), WHRB 10MW, AFBC Power Plant… — cleared for impact study, 40.4 km away
- Rohit Khediya — environmental approval granted, 40.7 km away
- Rajendra Kumar Khediya — under environmental review, 41.5 km away
- Rajendra Kumar Khediya — cleared for impact study, 41.5 km away
- Greenfield Steel comprising of DRI Kilns (Sponge Iron – 2,31,000 TPA),… — lapsed, 42.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.