33 KV Transmission line of 7.5 MW Hydel project of M/S Dhanwada Power & Infrastructure Pvt. Ltd is a lapsed power project in Charkhapara, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The site covers 80.9 acres.
Who is building it?
The applicant is Dhanvaada Power and Infrastructure Private Limited.
Has it been approved?
No. The application was lapsed on 9 Jul 2025, so it is no longer under consideration.
Where is it?
In Charkhapara, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹80 crore; a site of 80.9 acres and 11.1 acres (4.5 ha) of forest land.
When was it filed?
The application was filed on 9 Mar 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Jul 2025 |
| Application filed | 9 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Dhanvaada Power and Infrastructure Private Limited |
| Land area | 80.9 acres (32.8 ha) |
| Forest land | 11.1 acres (4.5 ha) |
| Project cost | ₹80 crore |
| Village / locality | Charkhapara |
| Taluk / tehsil | Udaipur (Dharamjaigarh) |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03756 |
In context
29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 80.9 acres, this one is smaller than 79% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Charkhapara, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Vijay Agrawal — environmental approval granted, 4.8 km away
- Chirodih Ordinary Stone Mine of Naveen Kumar Agrawal — environmental approval granted, 6.8 km away
- Balakpodi Quartz Quarry — environmental approval granted, 10.4 km away
- Anil Kumar Agrawal — lapsed, 14.7 km away
- Mining project by M/s. Dilip Buildcon Limited — environmental approval granted, 15.8 km away
- M/s. Dilip Buildcon Limited -Semipali Ordinary Stone Quarry — withdrawn, 15.8 km away
- Mining project by M/s. Dilip Buildcon Limited — cleared for impact study, 15.8 km away