Quick answers
What is Anil Kumar Agrawal?
Anil Kumar Agrawal is a lapsed mining project in Lipti, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The site covers 4.6 acres.
Who is building it?
The applicant is Anil Kumar Agrawal.
Has it been approved?
No. The application was lapsed on 1 Jun 2025, so it is no longer under consideration.
Where is it?
In Lipti, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹46 lakh and a site of 4.6 acres.
When was it filed?
The application was filed on 16 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Jun 2025 |
| Application filed | 16 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Anil Kumar Agrawal |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹46 lakh |
| Village / locality | Lipti |
| Taluk / tehsil | Udaipur (Dharamjaigarh) |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02717 |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 4.6 acres, this one is smaller than 65% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Lipti, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Balakpodi Quartz Quarry — environmental approval granted, 4.6 km away
- Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production… — not approved, 11.6 km away
- Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production… — lapsed, 11.6 km away
- Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production… — cleared for impact study, 11.6 km away
- 4g Saturation — in-principle approval, conditions pending, 12.6 km away
- 33 KV Transmission line of 7.5 MW Hydel project of M/S Dhanwada Power &… — lapsed, 14.7 km away
- Chirodih Ordinary Stone Mine of Naveen Kumar Agrawal — environmental approval granted, 17.1 km away
- Shri Vijay Agrawal — environmental approval granted, 18.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.