Quick answers
What is 4g Saturation?
4g Saturation is a proposed project in K U M a R T a R F, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In K U M a R T a R F, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹95 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 12 May 2026.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 12 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹95 lakh |
| Village / locality | K U M a R T a R F |
| Taluk / tehsil | Udaipur (Dharamjaigarh) |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04010 |
In context
10 applications in Raigarh since January 2022 are in the same category (Other): 1 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
K U M a R T a R F, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production… — not approved, 2.4 km away
- Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production… — lapsed, 2.4 km away
- Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production… — cleared for impact study, 2.4 km away
- Anil Kumar Agrawal — lapsed, 12.6 km away
- Balakpodi Quartz Quarry — environmental approval granted, 16.9 km away
- Bsnl 4g Saturation Project Raigarh ,village- Kamosindand — forest land use approved, 17.8 km away
- 4G satauration project Raigarh Area — lapsed, 18 km away
- Chirodih Ordinary Stone Mine of Naveen Kumar Agrawal — environmental approval granted, 25 km away
More from Mahesh Nair in Raigarh
- Bsnl 4g Saturation Project Raigarh ,village- Himmatpur — forest land use approved
- Bsnl 4g Saturation Project Raigarh ,village- Kamosindand — forest land use approved
- Raigarh-Gharghoda — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.