What is Developing? Open the mapMap

LapsedMining · Raigarh, Chhattisgarh

Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production of Bauxite ROM (80700 TPA) by M/s MAA Kudargarhi Steels Pvt Ltd

Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production of Bauxite ROM (80700 TPA) by M/s MAA Kudargarhi Steels Pvt Ltd is a lapsed mining project in K U M a R T a R F, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The site covers 334.1 acres. Its stated project cost is ₹25 crore. As of 27 Nov 2026, its status is “Lapsed” (since 2 Sept 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production of Bauxite ROM (80700 TPA) by M/s MAA Kudargarhi Steels Pvt Ltd is a lapsed mining project in K U M a R T a R F, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The site covers 334.1 acres.

Who is building it?

The applicant is Maa Kudargarhi Steels Private Limited.

Has it been approved?

No. The application was lapsed on 2 Sept 2026, so it is no longer under consideration.

Where is it?

In K U M a R T a R F, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹25 crore; a site of 334.1 acres and 303 acres (122.6 ha) of forest land.

When was it filed?

The application was filed on 8 Dec 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production of…

Project details

Official titleProposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production of Bauxite ROM (80700 TPA) at Village-Kandraja, Tehsil-Mainpat, District-Surguja, State- Chhattisgarh, by M/s MAA Kudargarhi Steels Pvt Ltd
StatusLapsed
Status since2 Sept 2026
Application filed8 Dec 2025
Approval soughtForest land use
Application typeNew project
SectorMining
ApplicantMaa Kudargarhi Steels Private Limited
Land area334.1 acres (135.2 ha)
Forest land303 acres (122.6 ha)
Project cost₹25 crore
Village / localityK U M a R T a R F
Taluk / tehsilUdaipur (Dharamjaigarh)
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-04186

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Dec 2025Not approved334.1 acres₹25 crore
New project filed 8 Dec 2025 (this page)Lapsed334.1 acres₹25 crore
Early planning filed 14 Mar 2024Cleared for impact study334.1 acres₹25 crore

In context

230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 334.1 acres, this one is larger than 73% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

K U M a R T a R F, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

3 Maa Kudargarhi Steels projects in Raigarh
All 18 Maa Kudargarhi Steels projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.