Quick answers
What is this project?
Diversion of Forest Land Proposed for Non-Forest Purpose Under Vss (Van Sanrakhsan Avam Samvardhan) Adhiyam 1980, Proposed for Construction of Intek Well and Laying of Pipeline Form Gerwani Nala to Nrvs Steel Limited,.Village-Taraimal, Tehsil- Tamnar, Dist.-Raigarh (Chhattisgarh) is a lapsed pipeline project in Tara\Mal, Tamnar, Raigarh, Chhattisgarh. The site covers 1 acre.
Who is building it?
The applicant is Nrvs Steels Limited.
Has it been approved?
No. The application was lapsed on 23 Oct 2025, so it is no longer under consideration.
Where is it?
In Tara\Mal, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹3.5 crore; a site of 1 acre and 1,180 m² of forest land.
When was it filed?
The application was filed on 18 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Oct 2025 |
| Application filed | 18 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Nrvs Steels Limited |
| Land area | 4,000 m² |
| Forest land | 1,180 m² |
| Project cost | ₹3.5 crore |
| Village / locality | Tara\Mal |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04018 |
In context
48 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tara\Mal, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land Proposed for Non-Forest Purpose Under Vss (Van… — under forest review, 850 m away
- Expansion of existing Steel Plant with New Induction Furnace (1 X 20 T and 1 X… — environmental approval granted, 1.7 km away
- Regularization of existing and operating Reheating Furnace based rolling mill… — cleared for impact study, 2 km away
- Request for Amendments to Environmental Clearance (Ec) Comprising of Change in… — environmental approval granted, 2.1 km away
- Integrated Steel Plant - Iron Ore Beneficiation Plant (1 x 5.2 MTPA, Pellet… — environmental approval granted, 2.1 km away
- Integrated Steel Plant - Iron Ore Beneficiation Plant (1 x 5.2 MTPA, Pellet… — cleared for impact study, 2.1 km away
- Regularization of Reheating Furnace based rolling mill for Chandrahasni Ispat… — lapsed, 2.3 km away
- Transfer of Environment Clearance from M/s. Singhal Enterprises Pvt. Ltd. to… — environmental approval granted, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.