Quick answers
What is this project?
Water Intake Infrastructure Facilities by Adani Power Limited is an approved industrial building project in Muhmela, Arang, Raipur, Chhattisgarh. The site covers 2.4 acres.
Who is building it?
The applicant is Adani Power Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 1 Jul 2026), as of 27 Nov 2026.
Where is it?
In Muhmela, Arang, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹110 crore; a site of 2.4 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 9 Nov 2025.
Project details
| Official title | Water Intake Infrastructure Facilities at Village Mohmella, Tehsil Arang, District Raipur, Chhattisgarh for Thermal Power Plant by Adani Power Limited. |
|---|---|
| Status | Forest land use approved |
| Status since | 1 Jul 2026 |
| Application filed | 9 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adani Power Limited |
| Use | Industrial |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Plot area | 9,620 m² (1,03,549 sq ft) |
| Project cost | ₹110 crore |
| Village / locality | Muhmela |
| Taluk / tehsil | Arang |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04040 |
In context
56 applications in Raipur since January 2022 are in the same category (Buildings & townships): 29 approved, 18 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.4 acres, this one is smaller than 95% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muhmela, Arang, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Krishna Kashyap — lapsed, 1.5 km away
- Krishna Kashyap — cleared for impact study, 1.5 km away
- Krishna Kashyap — under environmental review, 1.5 km away
- Smt. Basanti Sahu — more information requested, 3 km away
- Smt. Hema Pandey — environmental approval granted, 3.8 km away
- Aditya Kumar Verma — environmental approval granted, 4.1 km away
- Aditya Kumar Verma — not approved, 4.2 km away
- Rajendra Kumar Khediya — under environmental review, 4.9 km away
More from Adani Power Limited in Raipur
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — under environmental review
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — more information requested
- Expansion of Raipur Thermal Power Plant from 2970 MW [Phase I (2x685)MW +… — cleared for impact study
- 2x685 MW Super Critical and 2x800 MW Ultra-Super Critical Thermal Power Plant… — environmental approval granted
- Residential Township of Raipur Thermal Power Plant by Adani Power Limited — environmental approval granted
- Residential Township of Raipur Thermal Power Plant by Adani Power Limited — withdrawn
9 Adani Power projects in Raipur
All 68 Adani Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.