Quick answers
What is Gokuldem Basalt Quarry?
Gokuldem Basalt Quarry is an approved mining project in Gokole, Quepem, South Goa, Goa. The site covers 2.5 acres.
Who is building it?
The applicant is Meeravati Velip.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Oct 2024), as of 27 Nov 2026.
Where is it?
In Gokole, Quepem, South Goa, Goa.
How big is it?
It has a stated cost of ₹12 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 15 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Oct 2024 |
| Application filed | 15 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Meeravati Velip |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Gokole |
| Taluk / tehsil | Quepem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00005 |
In context
67 applications in South Goa since January 2022 are in the same category (Mining): 36 approved, 23 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 81% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Gokole, Quepem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Land Acquisition and Construction of Road From Quiscond to Corla in V.P… — lapsed, 2.7 km away
- Extension of validity of Environment Clearance for Basalt Stone Quarry located… — environmental approval granted, 3.6 km away
- Land Acquisition and Construction of Road From Quiscond to Corla in V.P… — lapsed, 4.3 km away
- Land Acquisition and Construction of Road From Quiscond to Corla in V.P… — lapsed, 4.6 km away
- Erection of GBT under USO 4G Saturation Project — forest land use approved, 6.5 km away
- Urgent Restoration to Existing Road Formation of NH66 Between Km. 572/500 to… — forest land use approved, 6.5 km away
- Diversion of 0.14 Ha of Forest Land for Urgent Restoration / Asphalting to… — lapsed, 8.1 km away
- Request to Provide Access Road — lapsed, 8.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.