Quick answers
What is this project?
Proposal for Setting up of WiFi connectivity at Verlem and Tudav Village, Netravali, Sanguem, South Goa is a proposed building project in Netravli, Sanguem, South Goa, Goa.
Who is building it?
The applicant is Atal Gram Development Agency – Goa.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Netravli, Sanguem, South Goa, Goa.
How big is it?
It has a stated cost of ₹5 lakh.
When was it filed?
The application was filed on 23 Oct 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 23 Oct 2025 |
| Application filed | 23 Oct 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Atal Gram Development Agency – Goa |
| Project cost | ₹5 lakh |
| Village / locality | Netravli |
| Taluk / tehsil | Sanguem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00342 |
In context
59 applications in South Goa since January 2022 are in the same category (Buildings & townships): 23 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Netravli, Sanguem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GoI USOF BSNL 4G Saturation Project at Verlem for laying of O/H ADSS OFC — under forest review, 1.7 km away
- GoI USOF BSNL 4G Saturation Project at Verlem for laying of O/H ADSS OFC — under wildlife review, 1.7 km away
- GoI USOF BSNL 4G Saturation Project at Verlem for laying of O/H ADSS OFC (W/L) — under wildlife review, 2.1 km away
- GOI USOF BSNL 4G Saturation Project at village Vichundrem — forest land use approved, 5.2 km away
- GOI USOF BSNL 4G Saturation project — forest land use approved, 6.4 km away
- One Time Permission for Construction of Residential House Upto 250 Sq Mts — lapsed, 6.5 km away
- BSNL GOA 4G Saturation Project — lapsed, 6.7 km away
- Proposed Laterite Stone Quarry of Lease Area 0.5000 Ha Located on land bearing… — environmental approval granted, 7.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.