Quick answers
What is this project?
Forest Land Diversion for Reconstruction of Existing Kuccha Road is a proposed building project in Cotigao, Canacona, South Goa, Goa. The site covers 3 acres.
Who is building it?
The applicant is Executive Engineer Wd Roads Fatorda Margao Goa.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Cotigao, Canacona, South Goa, Goa.
How big is it?
It has a stated cost of ₹1.9 crore and a site of 3 acres.
When was it filed?
The application was filed on 21 Jan 2025.
One of 4 filings for this project. The project's main page, with every filing and where each stands: Forest Land Diversion for Reconstruction of Existing Kuccha Road
Project details
| Official title | Proposal for Forest Land Diversion for Reconstruction of Existing Kuccha Road at Nadkem Village in Cotigao Wildlife Sanctuary Canacona Taluka |
|---|---|
| Status | More information requested |
| Status since | 21 Jan 2025 |
| Application filed | 21 Jan 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Wd Roads Fatorda Margao Goa |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹1.9 crore |
| Village / locality | Cotigao |
| Taluk / tehsil | Canacona |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00344 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Mar 2025 | More information requested | 2.5 acres | ₹1.9 crore |
| New project filed 3 Feb 2025 | Decision issued | ₹1.9 crore | |
| New project filed 21 Jan 2025 (this page) | More information requested | 3 acres | ₹1.9 crore |
| New project filed 4 Dec 2024 | Lapsed | ₹1.9 crore |
In context
59 applications in South Goa since January 2022 are in the same category (Buildings & townships): 23 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3 acres, this one is smaller than 56% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Cotigao, Canacona, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Land Diversion for Reconstruction of Existing Kuccha Road — more information requested, 0 m away
- Forest Land Diversion for Reconstruction of Existing Kuccha Road — decision issued, 650 m away
- Forest Land Diversion for Reconstruction of Existing Kuccha Road — lapsed, 650 m away
- Estimate for Work of Electrification of Left-Out Wada at Keri, Under Vp… — decision issued, 800 m away
- Estimate for Work of Electrification of Left-Out Wada at Keri, Under Vp… — forest land use approved, 800 m away
- GOI USOF BSNL 4G Saturation Project at Kuske-Yeda — forest land use approved, 1.8 km away
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks, 2.8 km away
- Development of Monem Tank in V.P Cotigao Canacona Taluka — lapsed, 5.1 km away
More from Executive Engineer Wd Roads Fatorda Margao Goa in South Goa
- Land Acquisition and Construction of Road From Quiscond to Corla in V.P… — lapsed
- Reconstruction of Existing Kuccha Road — more information requested
- Land Acquisition and Construction of Road From Quiscond to Corla in V.P… — lapsed
- Reconstruction of Existing Kuccha Road — decision issued
- Reconstruction of Existing Kuccha Road — lapsed
- Reconstruction of Existing Kuccha Road — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.