Quick answers
What is this project?
Gas Distribution Network in Valsad Taluka & Surrounding Areas, Diversion of 0.2614 Ha. Diversion Protected forest land i.e. road side strip plantation declared as protected for laying of 125/90/63/32 MM Dia MDPE Pipeline is a lapsed pipeline project in Abrama, Valsad, Gujarat. The site covers 0.6 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
No. The application was lapsed on 3 Oct 2026, so it is no longer under consideration.
Where is it?
In Abrama, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹75 lakh; a site of 0.6 acres and 2,610 m² of forest land.
When was it filed?
The application was filed on 15 Jun 2026.
Project details
| Official title | Gas Distribution Network in Valsad Taluka & Surrounding Areas, Diversion of 0.2614 Ha. Diversion Protected forest land i.e. road side strip plantation declared as protected for laying of 125/90/63/32 MM Dia MDPE Pipeline in Valsad Taluka of District Valsad in the State of Gujarat. |
|---|---|
| Status | Lapsed |
| Status since | 3 Oct 2026 |
| Application filed | 15 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 2,600 m² |
| Forest land | 2,610 m² |
| Project cost | ₹75 lakh |
| Village / locality | Abrama |
| Taluk / tehsil | Valsad |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12946 |
In context
35 applications in Valsad since January 2022 are in the same category (Pipelines): 22 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.6 acres, this one is larger than 70% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abrama, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 90/63/32 mm PE Gas Pipeline for Vejalpur Connectivity, Ta: Valsad, Dist.-Valsad. — forest land use approved, 1.3 km away
- Industrial project by M/s. Stalwart Advance Material Industries — under environmental review, 2.4 km away
- Industrial project by M/s. Stalwart Advance Material Industries — under environmental review, 2.4 km away
- Proposed Expansion Project for Manufacturing of Bulk Drugs (EXCIPIENTS) by M/s… — environmental approval granted, 2.4 km away
- Widening and strengthening of Valsad-Gundlav-Khergam road km 2/0 to 16/0 Ta.… — more information requested, 3.7 km away
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested, 4.5 km away
- Ishvara — environmental approval granted, 5.2 km away
- Diversion of 0.13 Ha Reserved Forest Land for Non-Forest Purpose Construction… — lapsed, 5.5 km away
More from Gujarat Gas Limited in Valsad
- Diversion of 0.03268 HA. of PF land for Reliable Packaging & Ayurvedic College… — more information requested
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested
- Diversion of 0.1544 Ha. protected forest land for laying 125/90 mm dia. MDPE… — lapsed
- Diversion of 0.0508 Hectare Protected Forest Land for Laying 125/90 Mm… — lapsed
- Permission for laying 4" dia. steel & 90 mm dia. PE pipeline along NH-48 &… — forest land use approved
- Permission for laying 6" dia. steel Natural Gas pipeline across to Ambica… — forest land use approved
29 Gujarat Gas projects in Valsad
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.