Project details
| Official title | Greenfield Project of "Grain Based Distillery Plant of 200 KLD along with Co-generation Power Plant of 4.9 MW" located at Village- Naika, Taluka- Kheda, District- Kheda, Gujarat by M/s Shukun Ethanol Pvt. Ltd. |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Nov 2023 |
| Application filed | 7 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Shukun Ethanol Private Limited |
| Land area | 21 acres (8.5 ha) |
| Project cost | ₹259.6 crore |
| Village / locality | Naika |
| Taluk / tehsil | Kheda |
| District | Kheda |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00554 |
In context
36 applications in Kheda since January 2022 are in the same category (Industry): 26 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 21 acres, this one is larger than 81% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naika, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Specialty Chemicals Manufacturing Plant of M/s. Expede-Tech Research… — environmental approval granted, 350 m away
- Proposed Specialty Chemicals Manufacturing Plant of M/s. Expede-Tech Research… — cleared for impact study, 350 m away
- Proposed laying of 125 mm Dia MDPE UG Gas pipeline parallel on Navagam - Nayka… — in-principle approval, conditions pending, 1 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — under environmental review, 2.7 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — cleared for impact study, 2.7 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — lapsed, 2.7 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — cleared for impact study, 2.7 km away
- Proposed 125 mm dia MDPE underground natural gas Pipeline originate from GGS -… — more information requested, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.