One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Specialty Chemicals Manufacturing Plant of M/s. Expede-Tech Research and…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Apr 2026 |
| Application filed | 17 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Expede-Tech Research & Development Private Limited |
| Land area | 18.7 acres (7.6 ha) |
| Project cost | ₹500 crore |
| Village / locality | Naika |
| Taluk / tehsil | Kheda |
| District | Kheda |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08835 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Aug 2026 | Environmental approval granted | 18.7 acres | ₹500 crore |
| Early planning filed 17 Nov 2025 (this page) | Cleared for impact study | 18.7 acres | ₹500 crore |
In context
36 applications in Kheda since January 2022 are in the same category (Industry): 26 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 18.7 acres, this one is larger than 75% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naika, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Specialty Chemicals Manufacturing Plant of M/s. Expede-Tech Research… — environmental approval granted, 0 m away
- Greenfield Project of "Grain Based Distillery Plant of 200 KLD by M/s Shukun… — environmental approval granted, 350 m away
- Proposed laying of 125 mm Dia MDPE UG Gas pipeline parallel on Navagam - Nayka… — in-principle approval, conditions pending, 1.1 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — under environmental review, 2.6 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — cleared for impact study, 2.6 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — lapsed, 2.6 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — cleared for impact study, 2.6 km away
- Proposed 125 mm dia MDPE underground natural gas Pipeline originate from GGS -… — more information requested, 3.9 km away
All 3 Expede-Tech Research & projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.