What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Surat, Gujarat

The Antilia

The Antilia is an approved building project in Mota Varachha, Majura, Surat, Gujarat. The site covers 1 acre. Its stated project cost is ₹27.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Aug 2023).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is The Antilia?

The Antilia is an approved building project in Mota Varachha, Majura, Surat, Gujarat. The site covers 1 acre.

Who is building it?

The applicant is Krishna Developers.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Aug 2023), as of 27 Nov 2026.

Where is it?

In Mota Varachha, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹27.9 crore and a site of 1 acre.

When was it filed?

The application was filed on 17 Aug 2023.

Project details

StatusEnvironmental approval granted
Status since17 Aug 2023
Application filed17 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantKrishna Developers
Land area3,900 m²
Project cost₹27.9 crore
Village / localityMota Varachha
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00603

What the filings say

What is planned

Krishna Developers proposes a new residential project named The Antilia in Mota Varachha, Surat. The project is planned on a plot area of 3,911.64 square metres (0.39 hectares). The applicant's project report describes the construction of three residential buildings, designated as Building A, B, and C.

Each of the three buildings is designed with a ground floor and 14 upper floors, reaching a height of 44.95 metres. The residential component consists of 168 dwelling units in total. The project also includes two basement levels for parking and services. The total built-up area for the project is 25,273.30 square metres.

ItemDetail
Number of Buildings3 (Blocks A, B, and C)
Total Floors2 Basements + Ground + 14 Floors
Building Height44.95 metres
Total Dwelling Units168
Total Built-up Area25,273.30 sq. mt.
FSI Area15,585.78 sq. mt.
Common Plot Area454.64 sq. mt.

Layout and design

The layout features three towers arranged around a central approach. Building B is positioned centrally, flanked by Building A and Building C. A 6.00-metre wide approach road provides internal access. The ground floor level is raised 0.60 metres above the plinth level.

Residential units are planned from the first to the fourteenth floors. Typical floor plans show four flats per floor in each building. Each unit includes a living room, kitchen, store, and three bedrooms with associated wash areas and balconies. The terrace floor at 44.95 metres includes open terrace space, stair cabins, and lift machine rooms.

Parking is distributed across the two basement levels and the ground floor. The project provides a total of 230 car parking spaces, which includes 20 spaces specifically designated for physically disabled persons. Additionally, space for 790 scooters is planned.

Water, power and access

The site is accessed via a 45.00-metre wide Town Planning (TP) road. For water management, the applicant proposes a 110 kilolitres per day (KLD) Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP) occupying 60 square metres. Domestic sewage will be discharged into the Surat Municipal Corporation (SMC) drainage system for final disposal.

Rainwater harvesting is planned through a collection system and one percolating recharge well. For power, the project includes a 50 KW rooftop solar installation covering 300 square metres of terrace space. Diesel Generator (DG) sets are proposed for emergency backup, to be housed in the basement with acoustic enclosures and stacks as per regulatory standards.

Environmental safeguards

The project report outlines an Environmental Management Plan (EMP) with a capital expenditure of ₹1.79 crore. Key components include:

Timeline

The applicant's project report states that the entire project is expected to be completed within approximately four years. Installation of environmental management units will proceed parallel to the project's construction.

The Antilia site plan and layout

4 drawings from the project's filings. Sign in free to see them.

The Antilia: Site layout: three residential towers, internal roads, and common plots (preview)🔒 Sign in free to see it
Site layout: three residential towers, internal roads, and common plots
The Antilia: Building elevation and sectional view showing 14 floors and basements (preview)🔒 Sign in free to see it
Building elevation and sectional view showing 14 floors and basements
The Antilia: Typical floor plan for Blocks A and C (preview)🔒 Sign in free to see it
Typical floor plan for Blocks A and C
The Antilia: Parking plan: ground floor and basement level layouts (preview)🔒 Sign in free to see it
Parking plan: ground floor and basement level layouts

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 91% of them.

149 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mota Varachha, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.