Quick answers
What is Kedar Heaven?
Kedar Heaven is an approved mixed-use project in Mota Varachha, Majura, Surat, Gujarat. It plans 229 units in 3 towers of up to 14 floors on 1 acre.
Who is building it?
The applicant is Gopin Construction.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Oct 2025), as of 27 Nov 2026.
Where is it?
In Mota Varachha, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹33 crore and a site of 1 acre.
When was it filed?
The application was filed on 1 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Oct 2025 |
| Application filed | 1 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gopin Construction |
| Use | Mixed use |
| Units | 229 |
| Towers | 3 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 263 |
| Land area | 3,900 m² |
| Built-up area | 27,782 m² (2,99,043 sq ft) |
| Plot area | 3,872 m² (41,678 sq ft) |
| Project cost | ₹33 crore |
| Village / locality | Mota Varachha |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07905 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Sept 2025 (this page) | Environmental approval granted | 1 acre | ₹33 crore |
| New project filed 13 May 2025 | Lapsed | 1 acre | ₹33 crore |
What the filings say
What is planned
Gopin Construction proposes to develop a residential and commercial project named Kedar Heaven in Mota Varachha, Surat. The applicant's project report describes a development consisting of four buildings (Blocks A, B, C, and D) with a maximum height of 44.89 metres.
The project components include:
- Residential Units: A total of 220 dwelling units across all blocks.
- Commercial Space: 9 shops located on the ground and first floors.
- Parking: Two basement levels (1st and 2nd basement) and ground-floor parking areas.
Building Configuration
| Block | Use | Floors | Units |
|---|---|---|---|
| Block A | Residential | Ground + 14 Floors | 52 Units |
| Block B-C | Residential | Ground + 14 Floors | 112 Units |
| Block D | Residential | Ground + 14 Floors | 56 Units |
| Commercial | Shops | Ground & 1st Floor | 9 Shops |
Layout and design
The project is designed with a total built-up area of 27,781.95 square metres. The layout includes a 30.00-metre wide Town Planning (TP) road adjacent to the site. Internal access is provided by 6.00-metre and 7.50-metre wide internal roads.
Block A contains four flats per floor from the second to the 14th floor. Blocks B and C are joined, containing eight flats per floor collectively. Block D contains four flats per floor. The ground floor is dedicated to parking, foyers, and commercial shops. The first floor includes both residential units and commercial shop space.
Water, power and access
The applicant's environmental management plan states that domestic effluent (sewage) will be discharged into the Surat Municipal Corporation (SMC) drainage system for treatment and disposal. A 150 kilolitres per day (KLD) Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP) is planned.
For water management, the project includes a rainwater collection system with one recharge well. Underground water tanks with a capacity of 1,00,000 litres each are shown in the layout plans. Power will be supplemented by a 70 KW rooftop solar energy system. Emergency power will be provided by Diesel Generator (DG) sets, which are to be housed in the basement with acoustic enclosures.
Environmental safeguards
The project includes a green belt development plan covering 673.16 square metres (17.38% of the plot area). This consists of 284.29 square metres of tree-covered area and 388.87 square metres of lawn. The applicant plans to plant 100 trees, including species such as Asopalav, Gulmohar, Palm, Badam, and Neem.
Solid waste management will be handled by an automatic Organic Waste Convertor (OWC) with a capacity of 250 kg per day. Dust mitigation measures and acoustic mufflers for large engines are proposed for the construction phase.
Timeline
The applicant's project report indicates that the entire project is expected to be completed within approximately three years from the start of construction. The installation of environmental management units will proceed parallel to the building construction.
Kedar Heaven site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 91% of them.
148 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mota Varachha, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kedar Heaven — lapsed, 0 m away
- The Antilia — environmental approval granted, 100 m away
- Shivansh Soliter — lapsed, 100 m away
- Vedant Solitaire — environmental approval granted, 150 m away
- Anmol Luxuria — environmental approval granted, 150 m away
- Pratham Arone — environmental approval granted, 250 m away
- Nilkanth — environmental approval granted, 250 m away
- Marvel Sky — environmental approval granted, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.