Environmental approval grantedBuildings & townships · Surat, Gujarat

Marvel Sky

Marvel Sky is an approved mixed-use project in Mota Varachha, Majura, Surat, Gujarat. It plans 298 units in 4 towers of up to 14 floors on 1.3 acres. Its stated project cost is ₹38.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Feb 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Marvel Sky?

Marvel Sky is an approved mixed-use project in Mota Varachha, Majura, Surat, Gujarat. It plans 298 units in 4 towers of up to 14 floors on 1.3 acres.

Who is building it?

The applicant is Laljibhai Gordhanbhai Sonani.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Feb 2026), as of 27 Nov 2026.

Where is it?

In Mota Varachha, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹38.1 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 11 Nov 2025.

Project details

StatusEnvironmental approval granted
Status since17 Feb 2026
Application filed11 Nov 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantLaljibhai Gordhanbhai Sonani
UseMixed use
Units298
Towers4
Floors (tallest)14
Basements2
Height45 m
Parking spaces332
Land area1.3 acres (0.5 ha)
Built-up area35,342 m² (3,80,418 sq ft)
Plot area5,221 m² (56,198 sq ft)
Project cost₹38.1 crore
Village / localityMota Varachha
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-09126

What the filings say

What is planned

Marvel Sky is a proposed residential and commercial building project by Laljibhai Gordhanbhai Sonani. The applicant's project report describes a development consisting of five building units (Blocks A through E) with a maximum height of 44.95 metres. The project is planned to include 268 residential flats and 30 commercial shops.

The buildings are designed with two basement levels for parking and 14 floors above ground. The floor-wise distribution of units is as follows:

ItemDetail
Total Plot Area5,221.00 sq. mt.
Net Plot Area5,221.00 sq. mt.
Total Built-up Area35,341.57 sq. mt.
FSI Area Consumed20,880.72 sq. mt.
Tallest Building Height44.95 metres
Total Residential Units268 Flats
Total Commercial Units30 Shops
Total Parking Provided10,237.35 sq. mt.

Layout and design

The project layout features five distinct blocks. Blocks A and B are integrated, while Blocks C, D, and E are separate units. The design incorporates a central common plot (C.O.P.) of 523.24 sq. mt. Internal access is provided via 6.00-metre wide internal roads. The ground floor and first floor are dedicated to commercial activities and parking, while the upper floors are primarily residential. The typical residential floors (3rd to 14th) feature 2-BHK and 3-BHK configurations.

Land and surroundings

The project is located on Final Plot No. 181 (Block No. 573) in Mota Varachha, Surat. The site is bounded by a 90.00-metre wide Ring Road on one side and an 18.00-metre wide margin road. Adjoining properties include social infrastructure plots and other final plots (F.P. No. 182 and 323). The land is situated within the Preliminary Town Planning Scheme No. 84 (Kosad-Bharthana Kosad-Mota Varachha-Abrama).

Water, power and access

Water requirements will be met through the Surat Municipal Corporation (SMC) supply. The applicant proposes a 200 KLD (kilolitres per day) Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP) for wastewater management. Treated sewage will be discharged into the SMC drainage system. For power, the project will rely on the local grid, with Diesel Generator (DG) sets provided for emergency backup. The plan includes a 100 KW rooftop solar energy system covering approximately 600 sq. mt. of terrace space. Access to the site is provided from the adjacent 90-metre Ring Road.

Environmental safeguards

The Environmental Management Plan (EMP) includes several mitigation measures:

Timeline

The applicant's project report states that the entire project is expected to be completed within approximately three years from the start of construction. Installation of environmental management units will proceed parallel to the building construction.

Marvel Sky site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Marvel Sky: Site layout: building blocks, internal roads, and common open space (preview)🔒 Sign in free to see it
Site layout: building blocks, internal roads, and common open space
Marvel Sky: Building elevation and cross-section showing 14 floors and basements (preview)🔒 Sign in free to see it
Building elevation and cross-section showing 14 floors and basements
Marvel Sky: Basement parking plans and parking area calculations (preview)🔒 Sign in free to see it
Basement parking plans and parking area calculations
Marvel Sky: Floor plans: Ground, 1st, and 2nd floor commercial and residential layouts (preview)🔒 Sign in free to see it
Floor plans: Ground, 1st, and 2nd floor commercial and residential layouts

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 66% of them.

151 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mota Varachha, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.