Greenfield 1 x 225 KLPD Grain based Ethanol Plant with 1 x 4.4 MW Cogeneration power plant is an approved industrial project in Porda, Dasada, Surendranagar, Gujarat. The site covers 33.1 acres.
Who is building it?
The applicant is Raghuvir Bio Fuel & Energy Limited Liability Partnership.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Mar 2023), as of 27 Nov 2026.
Where is it?
In Porda, Dasada, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹346.4 crore and a site of 33.1 acres.
When was it filed?
The application was filed on 11 Mar 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Mar 2023 |
| Application filed | 11 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Raghuvir Bio Fuel & Energy Limited Liability Partnership |
| Land area | 33.1 acres (13.4 ha) |
| Project cost | ₹346.4 crore |
| Village / locality | Porda |
| Taluk / tehsil | Dasada |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00911 |
In context
22 applications in Surendranagar since January 2022 are in the same category (Industry): 13 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 33.1 acres, this one is larger than 86% of them.
Where it is
Porda, Dasada, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — returned to applicant, 7.2 km away
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — returned to applicant, 7.2 km away
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — environmental approval granted, 7.2 km away
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — cleared for impact study, 7.2 km away
- Building project by M/s Real Environment Enterprises Pvt. Ltd. — environmental approval granted, 7.6 km away
- Four lane existing Malvan - Patadi - Dadada SH - 19 road under "Pragati Path… — under wildlife review, 8.8 km away
- Malvan-Patdi involved in Wild-Ass Sanctuary — more information requested, 9.3 km away
- Malvan to Bajana to Patdi Total length 15/244 KMS i.e. 0.69 ha. — lapsed, 9.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.