Quick answers
What is this project?
Malvan to Bajana to Patdi Total length 15/244 KMS i.e. 0.69 ha is a lapsed telecom project in Bajana, Dasada, Surendranagar, Gujarat. The site covers 1.7 acres.
Who is building it?
The applicant is Mohammad Irfan Shaikh.
Has it been approved?
No. The application was lapsed on 29 Apr 2026, so it is no longer under consideration.
Where is it?
In Bajana, Dasada, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹15 lakh; a site of 1.7 acres and 1.7 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 30 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Apr 2026 |
| Application filed | 30 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mohammad Irfan Shaikh |
| Land area | 1.7 acres (0.7 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Bajana |
| Taluk / tehsil | Dasada |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12385 |
In context
21 applications in Surendranagar since January 2022 are in the same category (Telecom): 4 approved, 5 filed or under review, and 12 withdrawn, lapsed or rejected. At 1.7 acres, this one is smaller than 54% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bajana, Dasada, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Malvan-Patdi involved in Wild-Ass Sanctuary — more information requested, 0 m away
- Four lane existing Malvan - Patadi - Dadada SH - 19 road under "Pragati Path… — under wildlife review, 650 m away
- Building project by M/s Real Environment Enterprises Pvt. Ltd. — environmental approval granted, 7.5 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : Mandal-Patdi via… — lapsed, 9.2 km away
- Greenfield 1 x 225 KLPD Grain based Ethanol Plant with 1 x 4.4 MW Cogeneration… — environmental approval granted, 9.3 km away
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — returned to applicant, 12.5 km away
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — returned to applicant, 12.5 km away
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — environmental approval granted, 12.5 km away
More from Mohammad Irfan Shaikh in Surendranagar
- Surendranagar, Chamraj to Velavadar, Sara to Thangadh Length 46725 Meter i.e.… — lapsed
- Diversion of 0.4428 ha. Protected Forest Land for laying Optical Fiber Cable… — lapsed
- Vavdi-Virendragadh-Khakharechi Length 18343 Meter 0.83 ha. — more information requested
- Permission for laying Optical Fiber Cable on SH-19, SH-138 Patadi - Zainabad -… — more information requested
- Permission for laying of Optical Fiber Cable from (1) Surendranagar – Dudhrej… — more information requested
- Malvan-Patdi involved in Wild-Ass Sanctuary — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.