Quick answers
What is Malvan-Patdi involved in Wild-Ass Sanctuary?
Malvan-Patdi involved in Wild-Ass Sanctuary is a proposed project in Bajana, Dasada, Surendranagar, Gujarat. The site covers 1.8 acres.
Who is building it?
The applicant is Mohammad Irfan Shaikh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bajana, Dasada, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹6 lakh and a site of 1.8 acres.
When was it filed?
The application was filed on 6 Mar 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 6 Mar 2024 |
| Application filed | 6 Mar 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mohammad Irfan Shaikh |
| Land area | 1.8 acres (0.7 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Bajana |
| Taluk / tehsil | Dasada |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14639 |
In context
6 applications in Surendranagar since January 2022 are in the same category (Other): 1 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bajana, Dasada, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Malvan to Bajana to Patdi Total length 15/244 KMS i.e. 0.69 ha. — lapsed, 0 m away
- Four lane existing Malvan - Patadi - Dadada SH - 19 road under "Pragati Path… — under wildlife review, 600 m away
- Building project by M/s Real Environment Enterprises Pvt. Ltd. — environmental approval granted, 7.5 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : Mandal-Patdi via… — lapsed, 9.2 km away
- Greenfield 1 x 225 KLPD Grain based Ethanol Plant with 1 x 4.4 MW Cogeneration… — environmental approval granted, 9.3 km away
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — returned to applicant, 12.5 km away
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — returned to applicant, 12.5 km away
- Proposed Synthetic Organic Chemicals (Active Pharmaceutical Ingredients… — environmental approval granted, 12.5 km away
More from Mohammad Irfan Shaikh in Surendranagar
- Surendranagar, Chamraj to Velavadar, Sara to Thangadh Length 46725 Meter i.e.… — lapsed
- Diversion of 0.4428 ha. Protected Forest Land for laying Optical Fiber Cable… — lapsed
- Malvan to Bajana to Patdi Total length 15/244 KMS i.e. 0.69 ha. — lapsed
- Vavdi-Virendragadh-Khakharechi Length 18343 Meter 0.83 ha. — more information requested
- Permission for laying Optical Fiber Cable on SH-19, SH-138 Patadi - Zainabad -… — more information requested
- Permission for laying of Optical Fiber Cable from (1) Surendranagar – Dudhrej… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.