Quick answers
What is Tokarpada Pumped Storage Project?
Tokarpada Pumped Storage Project is a proposed water and irrigation project in Tokarpada, Kaprada, Valsad, Gujarat. The site covers 417.1 acres.
Who is building it?
The applicant is Torrent Power Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Sept 2023), as of 27 Nov 2026.
Where is it?
In Tokarpada, Kaprada, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹5,620.8 crore and a site of 417.1 acres.
When was it filed?
The application was filed on 3 Aug 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Sept 2023 |
| Application filed | 3 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Torrent Power Limited |
| Land area | 417.1 acres (168.8 ha) |
| Project cost | ₹5,620.8 crore |
| Village / locality | Tokarpada |
| Taluk / tehsil | Kaprada |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00924 |
In context
9 applications in Valsad since January 2022 are in the same category (Water & irrigation): 6 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tokarpada, Kaprada, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tokarpada Pumped Storage Hydroelectric Project (1300 MW) — returned to applicant, 200 m away
- Diversion of 19.3778 Ha Reserved Forest Land for construction of 66KV… — under forest review, 1.9 km away
- M/S. PRAMUKH STONE INDUSTRIES (Narwad Blacktrap Quarry Lease) — environmental approval granted, 8.1 km away
- Diversion of Reserve Forest Land for Widening of Dhamni - Tokarpada Road (MDR)… — under forest review, 8.3 km away
- Diversion of Reserve Forest Land for Widening of Dhamni - Tokarpada Road (MDR)… — lapsed, 8.3 km away
- M/s Raj Construction Co., Re-appraisal of Environment Clearance granted by… — not approved, 9.9 km away
- Project at Valsad for laying OF cable for BSNL 4G Tower — lapsed, 13 km away
- Shree Sai Vanraj Stone Quarry — environmental approval granted, 13.5 km away
More from Torrent Power Limited in Valsad
- Pindval Pumped Storage Project (1000 MW) — cleared for impact study
- Pindval Pumped Storage Project (1000 MW) — cleared for impact study
- Tokarpada Pumped Storage Hydroelectric Project (1300 MW) — returned to applicant
4 Torrent Power projects in Valsad
All 28 Torrent Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.